

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Donaldson Torit Dust Collector UMA 150V
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Dust Collector Inspection
Warning: This inspection requires trained personnel with PPE!
Enter the pressure differential across the filter assembly
Is the cleaning mechanism functioning properly?
Enter the filter resistance measured by U-tube manometer or differential-type pressure gauge
Is the filter resistance within the expected range?
Is the secondary or absolute filter monitor functioning properly?
Is the general casing integrity satisfactory?
Are door fastener threads lubricated?
Is the ignition minimising fan's lining inside the casing in good condition?
Filter Assembly Replacement
Isolate electrical controls and open fan and filter chamber access doors.
Fully slacken the four captive wing-nuts located in the fan chamber, on the top plate of venting type collectors or in the side outlet box.
With the aid of a colleague, withdraw the complete filter assembly through the front of the filter chamber.
Remove wire mesh insert frames from individual filter bags. Check for broken mesh and worn material edgings, especially around the area of any filter bag damage.
Detach filter bag assembly from supporting frame.
Fit new filter bag assembly into supporting frame, feeding individual filter bags between locating bars, and fold collar over peripheral sealing flange.
Prior to fitting wire mesh inserts, replace any material edgings that need replacing around the three edges of the insert that do not have the insert frame joint. Fit the inserts, edging first, into the filter bags.
With the aid of a colleague, slide filter assembly into the guides until bottom corners of filter bags make contact with the shaker bar.
Locate individual filter bags in shaker bar.
1 Weekly Dust Collector Maintenance
Pressure drop across the filter assembly
Record the figure in the log book
Pressure drop increased significantly over two or three successive checks?
Check the filter if pressure drop increased significantly
Pressure drop across the secondary or absolute filter
Change the filter when the pressure drop reaches 100 mm W.G.
Inspect the explosion relief assembly weekly
Ensure the bursting panels are intact and clear of obstruction
Prevent build-up of snow or ice on explosion panels during winter
Fan Bearings Replacement
Isolate electrical supply and remove fan chamber lid
Disconnect electrical wiring to terminal box
Remove the four bolts securing the motor drive bed-plate and withdraw the complete assembly from the unit case
Loosen, but do not remove, the four socket screws in the base flange and withdraw drive cover
Remove drive belt
Remove the six nuts securing flange of bearing housing to the bed-plate and withdraw the housing
Remove fan pulley and the six bolts securing the fan case
Remove fan impeller and fan case
Remove end caps and spacers from fan bearing housing
Absolute Filter Replacement
Warning: Ensure you are wearing appropriate PPE before starting the procedure.
Open secondary/absolute filter door.
UMA 40MM – Lift bar to release sealing mechanism.
UMA 100-450 – Undo clamping nuts or clips as appropriate and remove retaining mesh or frame.
UMA 750 – Undo clamping nuts sufficient to allow element removal.
Remove used element, place it directly into a plastic bag and then seal the bag.
Slide the new element into the housing, with the element seal against the secondary/absolute filter seal frame, until it reaches the backstop.
Clamp element in position using the arrangement provided.
Close secondary/absolute filter door.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













