MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Water Chiller WDC087

Need answers fast?
Explore the manual using AI.

Daikin Water Chiller WDC087
Daikin Water Chiller WDC087

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Water Chiller WDC087

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Water Chiller WDC087

Daikin Water Chiller WDC087

Create an account to install this asset package.

Maintenance Plans for Daikin Water Chiller Model WDC087

Integrate maintenance plans directly into your work orders in MaintainX.

Refrigerant Cycle Maintenance

Check mark

Maintenance of the refrigerant cycle includes maintaining a log of the operating conditions, and checking that the unit has the proper oil and refrigerant charge.

Check mark

Oil level

Check mark

Suction pressure

Check mark

Discharge pressure

Check mark

Condenser water temperature

Check mark

Chiller water temperature

Check mark

The suction line temperature at the compressor should be taken at least once a month.

Check mark

Suction line temperature at the compressor

Check mark

Subtracting the saturated temperature equivalent of the suction pressure from this will give the suction superheat.

Run this procedureArrow right

1 Yearly Condenser Tubes Cleaning

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Procedure

Check mark

Check approach temperature

Check mark

Record the water and the saturated refrigerant temperatures

Check mark

Check if approach increase is two-degrees or more

Check mark

Check for higher than normal discharge pressure and motor current

Check mark

Inspect the condenser tubes for fouling

Check mark

Clean the condenser tubes if required

Check mark

Procedure to remove the dished water heads

Run this procedureArrow right

1 Monthly Suction Line Temperature Check

Check mark

Refrigerant Cycle Maintenance

Check mark

At every inspection, the oil, suction, and discharge pressures should be noted and recorded, as well as condenser and chiller water temperatures.

Check mark

Record the oil pressure

Check mark

Record the suction pressure

Check mark

Record the discharge pressure

Check mark

Record the condenser water temperature

Check mark

Record the chiller water temperature

Check mark

The suction line temperature at the compressor should be taken at least once a month.

Check mark

Record the suction line temperature at the compressor

Run this procedureArrow right

3 Monthly Air Compressor Starter Maintenance

Check mark

Examine Contactors (hardware and operation)

Check mark

Verify Overload Setting and Trip

Check mark

Test Electrical Connections (Infrared temp measurement)

Check mark

Sign off on the air compressor starter maintenance

Run this procedureArrow right

Oil Filter Replacement

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Daikin chillers are at positive pressure at all times and do not leak contaminated moist air into the refrigerant circuit, thereby eliminating the need for annual oil changes.

Check mark

An annual laboratory oil check is recommended to check overall compressor condition.

Check mark

Isolate the filter cavities. Close the oil discharge line service valve at the oil pump (at the filter on CE126).

Check mark

Remove the filter cover; some foaming can occur but the check valve should limit leakage from other compressor cavities.

Check mark

Remove the filter, replace with new element, and replace filter cover using a new gasket.

Check mark

Reopen the valve in the pump discharge line and purge air from the oil filter cavity.

Check mark

When machine is operated again, the oil level must be checked to determine if oil needs to be added to maintain the proper operating level.

Check mark

Sign off on the oil filter replacement

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets