MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Water Chiller WCC087

Need answers fast?
Explore the manual using AI.

Daikin Water Chiller WCC087
Daikin Water Chiller WCC087

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Water Chiller WCC087

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Water Chiller WCC087

Daikin Water Chiller WCC087

Create an account to install this asset package.

Maintenance Plans for Daikin Water Chiller Model WCC087

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Protective Controls Maintenance

Check mark

Test operation of Alarm Relay

Check mark

Test operation of Pump Interlocks

Check mark

Test operation of Guardistor and Surgeguard

Check mark

Test operation of High and Low Pressure Cutouts

Check mark

Test operation of Oil Pump Pressure Differential Cutout

Check mark

Test operation of Oil Pump Time Delay

Check mark

At least once a quarter, all equipment protection controls except compressor overloads should be made to operate and their operating points checked.

Check mark

Check if pump interlocks and flow switches interrupt the control circuit when tripped.

Check mark

Inspect and clean the contactors in the motor starter

Run this procedureArrow right

5 Yearly Relief Valve Replacement

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Is the valve closest to the valve stem leaking?

Check mark

If yes, back seat the three-way valve all the way, closing the port to the leaking pressure relief valve.

Check mark

Was the faulty relief valve removed and replaced?

Check mark

Is the relief valve farthest from the valve stem leaking?

Check mark

If yes, front seat the three-way valve.

Check mark

Was the relief valve replaced as stated above?

Check mark

Was the refrigerant pumped down into the condenser before the evaporator relief valve was removed?

Check mark

Sign off on the relief valve replacement

Run this procedureArrow right

1 Yearly Motor Maintenance

Check mark

Warning: Only fully qualified technicians must attempt service.

Check mark

Meg. Windings

Check mark

Power factory correction capacitors disconnected?

Check mark

Surge capacitor disconnected?

Check mark

Terminal Check (Infrared temperature measurement)

Check mark

Enter the temperature reading

Check mark

Motor Cooling Filter Drier Pressure Drop

Check mark

Enter the pressure drop reading

Check mark

Technician's signature

Run this procedureArrow right

1 Yearly Lubrication System Maintenance

Check mark

Clean Oil Cooler Strainer (water)

Check mark

Upload the results of the Oil Analysis

Check mark

Oil filter change and compressor teardown and inspection should be done based on the results of the annual oil test performed by a company specializing in this type of test.

Check mark

Enter the recommendations from Daikin Service

Check mark

Sign off on the lubrication system maintenance

Run this procedureArrow right

Initial 500 Hours Oil Condition Check

Check mark

Key to Action

Check mark

1) Re-sample after 500 hours of unit operation.

Check mark

a) If content increases less than 10%, change oil and oil filter and re-sample at normal interval (usually annual).

Check mark

b) If content increases between 11% and 24%, change oil and oil filter and re-sample after an additional 500 hours of operation.

Check mark

c) If content increases more than 25%, inspect compressor for cause.

Check mark

2) Re-sample after 500 hours of unit operation.

Check mark

a) If content increases less than 10%, change filter-drier and re-sample at normal interval (usually annual).

Check mark

b) If content increases between 11% and 24%, change filter-drier and re-sample after an additional 500 hours of operation.

Check mark

c) If content increases more than 25%, monitor for a water leak.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets