Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Outdoor Unit Cooling Only Air Conditioner RKS71JVMG
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Outer Panel Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
1. Remove the suction grille.
1) Unfasten the 5 hooks.
2) Remove the suction grille.
2. Remove the top panel.
The design of the discharge grille varies depending on the model.
1) Remove the 8 screws.
2) Lift the top panel and remove it.
3. Remove the right side panel.
Coil / Thermistor Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Pull out the electronic expansion valve coil.
Remove the screw and remove the four way valve coil.
The cooling only models have no four way valve coil.
Pull out the outdoor heat exchanger thermistor.
Be careful not to lose the clip for the thermistor.
Slightly open the sound blanket (outer).
Remove the sound blanket (top upper).
The design of the sound blankets varies depending on the model.
Compressor Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Warning: Be careful not to get yourself burnt with the pipes and other parts that are heated by the gas brazing machine.
Warning: If the refrigerant gas leaks during work, ventilate the room. (If the refrigerant gas is exposed to flames, toxic gas may be generated.)
Warning: Since it may happen that the refrigerant oil in the compressor catches fire, prepare wet cloth so as to extinguish fire immediately.
Caution: From the viewpoint of global environment protection, do not discharge the refrigerant gas in the atmosphere. Make sure to collect all the refrigerant gas.
Caution: Restore the piping by non-oxidation brazing.
Note: Before working, make sure that the refrigerant gas is empty in the circuit.
Note: Be sure to apply nitrogen replacement when heating up the brazed part.
Note: Do not use a metal saw for cutting pipes by all means because the sawdust comes into the circuit.
PCB Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove the cover of the electrical box
Disconnect the connectors [S52] and [S102] from the service monitor PCB
Detach the 4 clamps with pliers and remove the service monitor PCB
Remove the screws of the terminal board and the earth / ground wire
Unfasten the hook on the right and open the terminal board
Disconnect the harnesses
Disconnect the 2 harnesses for the reactor [HR1] [HR2]
Remove the 3 screws of the main PCB
Sound Blanket Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Sound blanket (outer) opened
Sound blanket (top upper) removed
Screw removed and partition plate (1) slightly pushed to the left for easy work
Sound blanket (outer) removed
The design of the sound blankets varies depending on the model. The sound blanket is fragile. Carefully pass the discharge pipe through it. Since the piping ports are torn easily, remove the sound blanket carefully.
Sound blanket (top lower) removed
Some models have no sound blanket (top lower).
Sound blanket (inner) removed
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













