MaintainX Logo
EnterprisePricing
Daikin

Daikin Packaged Rooftop System Dps028AHMW4DW-4

Need answers fast?
Explore the manual using AI.

Daikin Packaged Rooftop System Dps028AHMW4DW-4
Daikin Packaged Rooftop System Dps028AHMW4DW-4

The Daikin Packaged Rooftop System DPS028AHMW4DW-4 is a high-efficiency HVAC solution designed for commercial applications. This model offers reliable climate control with advanced features, ensuring optimal performance and energy savings for your building's heating and cooling needs.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Packaged Rooftop System Dps028AHMW4DW-4

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Packaged Rooftop System Dps028AHMW4DW-4

Daikin Packaged Rooftop System Dps028AHMW4DW-4

Create an account to install this asset package.

Maintenance Plans for Daikin Packaged Rooftop System Model Dps028AHMW4DW-4

Integrate maintenance plans directly into your work orders in MaintainX.

1 Monthly Rooftop System Maintenance

Check mark

Check cabinet air filters and replace if dirty

Check mark

After heavy snowfall verify that combustion air intakes are not blocked by snow

Check mark

Periodically check during periods of snow accumulation as drifting may also lead to combustion air intake blockage

Check mark

Open a door on each section and verify that no moisture or debris is accumulating in the unit monthly during preparation for storage

Check mark

Sign off on the monthly rooftop system maintenance

Run this procedureArrow right

Compressor Ground Fault Interrupter Service

Check mark

Warning: This service requires trained personnel with PPE!

Check mark

Is the Rebel 003–015 unit equipped with a ground fault interrupter?

Check mark

Is the current sensing donut on the power wires to the compressor(s) functional?

Check mark

Is the PCB functional?

Check mark

Is the device monitoring the balance between the three phase power and the neutral conductor?

Check mark

Note: The device is not intended to provide overcurrent or short circuit protection to the equipment.

Check mark

Is the device opening the 120V controls circuit in a fault condition?

Check mark

Is there an open condition on the ground fault interrupter?

Check mark

Report any issues found during the service

Run this procedureArrow right

1 Yearly Rooftop System Maintenance

Check mark

Check vent terminal screens for blockages and accumulation

Check mark

Heater and the Venting System shall be inspected once a year by a qualified service agency.

Check mark

Check all valves, piping and connections of Gas Train for leakage with a rich soap solution or UL 913 combustible gas leak detector. Any bubbling is considered a leak and must be eliminated.

Check mark

Inspect and clean flame rod, ignition electrode, and burner manifold

Check mark

Remove any debris that may have accumulated in the drain pain and drain

Check mark

Sign off on the rooftop system maintenance

Run this procedureArrow right

Rooftop System Charge Maintenance

Check mark

Re-charge the unit

Check mark

The Rebel unit has many configurable options that can affect the refrigerant charge. Actual unit charge is given on the unit's data plate found on the inside of the control panel

Check mark

The Rebel unit uses electronic expansion valves that maintain peak efficiency. Liquid sub-cooling and suction super heat float and should not be used as an indication that charge needs to be added or removed from the system

Check mark

If a leak is suspected, the full charge should be removed and weighed. Weight should be compared against the unit nameplate data. Unit should be recharged with the amount given on the unit nameplate

Check mark

POE and PVE oil is hygroscopic and does absorb moisture when exposed to atmosphere. Steps should be taken to minimize exposure time to atmosphere during any maintenance where the sealed system is to be opened

Check mark

Rebel 003-015 refrigerant systems use only Polyvinylether (PVE) oil. Rebel 016-028 refrigerant systems use only Polyester (POE) oil

Check mark

NOTICE: Do not use POE oil in DPS 003-015 refrigerant systems and do not use PVE oil in DPS 016-028 refrigerant systems

Check mark

The entire system must be evacuated using a suitable vacuum pump

Check mark

The quality of vacuum is measured using a suitable micron gauge that has been calibrated

Run this procedureArrow right

3 Monthly Coated Coil Cleaning

Check mark

Clean Option E Coated Coils Surfaces

Check mark

Quarterly cleaning is essential to extend the life of an Option E Coated Coil and is required to maintain warranty coverage

Check mark

Coil cleaning shall be part of the unit's regularly scheduled maintenance procedures

Check mark

Failure to clean an Option E Coated Coil will void the warranty and may result in reduced efficiency and durability in the environment

Check mark

For routine quarterly cleaning, first clean the coil with the below approved coil cleaner

Check mark

Coil cleaned with approved cleaner?

Check mark

After cleaning the coils with the approved cleaning agent, use the approved chloride remover (under the Recommended Chloride Remover section) to remove soluble salts and revitalize the unit

Check mark

Coil cleaned with approved chloride remover?

Check mark

Sign off on the coil cleaning

Run this procedureArrow right

Parts for Daikin Packaged Rooftop System Dps028AHMW4DW-4

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Furnace Control

VB1200

Modulating Valve

M520B

Staged Furnace

404225351

Staged Furnace

300049725

Natural Gas Fired Furnace

910166415

Furnace Control

VB1200

Modulating Valve

M520B

Staged Furnace

404225351

Staged Furnace

300049725

Natural Gas Fired Furnace

910166415

Furnace Control

VB1200

Modulating Valve

M520B

Staged Furnace

404225351

Staged Furnace

300049725

Natural Gas Fired Furnace

910166415

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets