Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Daikin 4-Zone Cooling-Only Outdoor Unit 4MXS68F2V1B
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Outer Panel Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Appearance features: Take care not to cut your finger by the fins of the heat exchanger.
Removed the 4 screws (2 on both sides) of the top panel.
Removed the 6 screws of the front panel.
Removed the screw of the shield plate.
Slid the shield plate to the left to unfasten the hooks and removed the shield plate.
Unfastened the upper 2 hooks. Aligned the position of hole of the upper hook to pull the front panel out.
Lifted the front panel up to unfasten the left side hooks. The front panel has 3 hooks on the left.
Unfastened the right side hook and removed the front panel.
Compressor Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove the terminal cover.
Disconnect the compressor lead wires.
Detach the overload protector.
Remove the putty.
Remove the 2 nuts.
Before working, make sure that the refrigerant gas is empty in the circuit.
Be sure to apply nitrogen replacement when heating up the brazed part.
Heat up the brazed part of the discharge side and disconnect the part (a).
Sound Blanket Removal
Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
1. Remove the right side panel.
Preparation
Remove the outer panels and plates.
Remove the electrical box.
1 Remove the 3 screws of the right side panel.
2 Remove the 2 screws on the back.
3 Remove the protection rubber. There is a hook on the back.
4 Lift up and remove the right side panel.
Four Way Valve Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Before working, make sure that the refrigerant gas is empty in the circuit.
Be sure to apply nitrogen replacement when heating up the brazed part.
The cooling only models have no four way valve coil.
Warning: Be careful not to get yourself burnt with the pipes and other parts that are heated by the gas brazing machine.
Warning: If the refrigerant gas leaks during work, ventilate the room. (If the refrigerant gas is exposed to flames, toxic gas may be generated.)
Caution: From the viewpoint of global environment protection, do not discharge the refrigerant gas in the atmosphere. Make sure to collect all the refrigerant gas.
Cautions for restoration
1. Restore the piping by nonoxidation brazing.
PCB Removal
Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
1. Remove the service monitor PCB.
1 External appearance
2 Remove the screw of the terminal board and open it.
3 Disconnect the connectors [S52] [S102] from the service monitor PCB.
4 Unfasten the upper hook and pull the service monitor PCB upward to remove.
2. Remove the main PCB.
[AC1] [AC2] : for power supply [S10] : for transmission
1 Disconnect the connectors for the terminal board on the right side.
Access the parts list for your equipment in MaintainX.
Silicon Grease
1172698
Silicon Grease
1172698
Silicon Grease
1172698
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX