MaintainX Logo
EnterprisePricing
Daikin

Daikin 4-Zone Cooling-Only Outdoor Unit 4MKS75F2V1B

Need answers fast?
Explore the manual using AI.

Daikin 4-Zone Cooling-Only Outdoor Unit 4MKS75F2V1B
Daikin 4-Zone Cooling-Only Outdoor Unit 4MKS75F2V1B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin 4-Zone Cooling-Only Outdoor Unit 4MKS75F2V1B

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin 4-Zone Cooling-Only Outdoor Unit 4MKS75F2V1B

Daikin 4-Zone Cooling-Only Outdoor Unit 4MKS75F2V1B

Create an account to install this asset package.

Maintenance Plans for Daikin 4-Zone Cooling-Only Outdoor Unit Model 4MKS75F2V1B

Integrate maintenance plans directly into your work orders in MaintainX.

Outer Panel Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work. Take care not to cut your finger by the fins of the heat exchanger.

Check mark

Appearance features checked

Check mark

Remove the 4 screws (2 on both sides) of the top panel.

Check mark

Remove the 6 screws of the front panel.

Check mark

Remove the screw of the shield plate.

Check mark

Slide the shield plate to the left to unfasten the hooks and remove the shield plate.

Check mark

Unfasten the upper 2 hooks. Align the position of hole of the upper hook to pull the front panel out.

Check mark

Lift the front panel up to unfasten the left side hooks. The front panel has 3 hooks on the left.

Check mark

Unfasten the right side hook and remove the front panel.

Run this procedureArrow right

Distributor Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Refrigerant gas is empty in the circuit

Check mark

Warning: Be careful not to get yourself burnt with the pipes and other parts that are heated by the gas brazing machine.

Check mark

Warning: If the refrigerant gas leaks during work, ventilate the room. (If the refrigerant gas is exposed to flames, toxic gas may be generated.)

Check mark

Caution: From the viewpoint of global environment protection, do not discharge the refrigerant gas in the atmosphere. Make sure to collect all the refrigerant gas.

Check mark

Piping restored by nonoxidation brazing

Check mark

Four way valve wrapped with wet cloth and provided water so that the cloth does not dry

Check mark

Brazed part disconnected where is easy to disconnect and restore

Check mark

Pipes on the main unit cut with a tube cutter in order to make it easy to disconnect

Run this procedureArrow right

Sound Blanket Removal

Check mark

Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

1. Remove the right side panel.

Check mark

Preparation

Check mark

Remove the outer panels and plates.

Check mark

Remove the electrical box.

Check mark

1 Remove the 3 screws of the right side panel.

Check mark

2 Remove the 2 screws on the back.

Check mark

3 Remove the protection rubber. There is a hook on the back.

Check mark

4 Lift up and remove the right side panel.

Run this procedureArrow right

Four Way Valve Removal

Check mark

Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

Before working, make sure that the refrigerant gas is empty in the circuit.

Check mark

Be sure to apply nitrogen replacement when heating up the brazed part.

Check mark

The cooling only models have no four way valve coil.

Check mark

Warning: Be careful not to get yourself burnt with the pipes and other parts that are heated by the gas brazing machine.

Check mark

Warning: If the refrigerant gas leaks during work, ventilate the room. (If the refrigerant gas is exposed to flames, toxic gas may be generated.)

Check mark

Caution: From the viewpoint of global environment protection, do not discharge the refrigerant gas in the atmosphere. Make sure to collect all the refrigerant gas.

Check mark

Cautions for restoration

Check mark

1. Restore the piping by nonoxidation brazing.

Run this procedureArrow right

Electrical Box Removal

Check mark

Warning Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.

Check mark

1. Disconnect the harnesses.

Check mark

The illustrations are for 3- room models as representative, 4-room models also have D port.

Check mark

1 Layout of the connecting wires

Check mark

The wires are fixed to the terminal board with screws.

Check mark

Connecting wires

Check mark

(1) Black : Power supply

Check mark

(2) White : Power supply

Check mark

(3) Red : Transmission

Run this procedureArrow right

Parts for Daikin 4-Zone Cooling-Only Outdoor Unit 4MKS75F2V1B

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Silicon Grease

1172698

Silicon Grease

1172698

Silicon Grease

1172698

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets