MaintainX Logo
EnterprisePricing
Daikin

Daikin Packaged Rooftop System DPS007AHMY4DW-3

Need answers fast?
Explore the manual using AI.

Daikin Packaged Rooftop System DPS007AHMY4DW-3
Daikin Packaged Rooftop System DPS007AHMY4DW-3

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Packaged Rooftop System DPS007AHMY4DW-3

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Packaged Rooftop System DPS007AHMY4DW-3

Daikin Packaged Rooftop System DPS007AHMY4DW-3

Create an account to install this asset package.

Maintenance Plans for Daikin Packaged Rooftop System Model DPS007AHMY4DW-3

Integrate maintenance plans directly into your work orders in MaintainX.

9000 Hours / 6 Monthly Rooftop System Maintenance

Check mark

Check all moving parts for wear every six months

Check mark

The Rebel exhaust fans are direct drive variable speed fan/motor combination, which do not have belts or pulleys to maintain

Check mark

The bearings are permanently sealed and do not require periodic greasing. The Rebel 3-15 ton units have similar supply fans.

Check mark

The Rebel 16-28 tons supply fans have a direct drive motor

Check mark

These larger motors are not permanently sealed and will require greasing every 9000 hours

Run this procedureArrow right

3 Monthly Coated Coil Cleaning

Check mark

Clean Option E Coated Coils Surfaces

Check mark

Quarterly cleaning is essential to extend the life of an Option E Coated Coil and is required to maintain warranty coverage

Check mark

Coil cleaning shall be part of the unit's regularly scheduled maintenance procedures

Check mark

Failure to clean an Option E Coated Coil will void the warranty and may result in reduced efficiency and durability in the environment

Check mark

For routine quarterly cleaning, first clean the coil with the below approved coil cleaner

Check mark

Coil cleaned with approved cleaner?

Check mark

After cleaning the coils with the approved cleaning agent, use the approved chloride remover (under the Recommended Chloride Remover section) to remove soluble salts and revitalize the unit

Check mark

Coil cleaned with approved chloride remover?

Check mark

Sign off on the coil cleaning

Run this procedureArrow right

Rooftop System Maintenance

Check mark

Warning: This maintenance requires trained and experienced service technician

Check mark

Fuel pressure settings and control settings should be made only by persons thoroughly experienced with the burner and control system

Check mark

Always replace covers on burner controls and boxes as the electrical contacts are sensitive to dust and dirt

Check mark

Perform maintenance of controls, gas valves, and other components in accordance with instructions in the manufacturer’s bulletins

Check mark

Installation and maintenance must be performed only by qualified personnel who are experienced with this type of equipment and familiar with local codes and regulations

Check mark

Gas or Hot Water Piping: A qualified Architect or Systems HVAC Design Engineer familiar with piping design, local codes and regulations, must provide piping design

Check mark

Moving machinery and electrical power hazards. May cause severe personal injury or death. Disconnect and lock off all power before servicing equipment

Check mark

Sharp edges are inherent to sheet metal parts, screws, clips, and similar items. May cause personal injury. Exercise caution when servicing equipment

Check mark

Disconnect all electric power to the unit when servicing control panel components. Before servicing, always inspect units for multiple disconnects to ensure all power is removed from the control panel and its components

Run this procedureArrow right

Rooftop System Charge Maintenance

Check mark

Re-charge the unit

Check mark

The Rebel unit has many configurable options that can affect the refrigerant charge. Actual unit charge is given on the unit's data plate found on the inside of the control panel.

Check mark

The Rebel unit uses electronic expansion valves that maintain peak efficiency. Liquid sub-cooling and suction super heat float and should not be used as an indication that charge needs to be added or removed from the system.

Check mark

If a leak is suspected, the full charge should be removed and weighed. Weight should be compared against the unit nameplate data. Unit should be recharged with the amount given on the unit nameplate.

Check mark

POE and PVE oil is hygroscopic and does absorb moisture when exposed to atmosphere. Steps should be taken to minimize exposure time to atmosphere during any maintenance where the sealed system is to be opened.

Check mark

Rebel 003-015 refrigerant systems use only Polyvinylether (PVE) oil. Rebel 016-028 refrigerant systems use only Polyester (POE) oil.

Check mark

NOTICE: Do not use POE oil in DPS 003-015 refrigerant systems and do not use PVE oil in DPS 016-028 refrigerant systems.

Check mark

The entire system must be evacuated using a suitable vacuum pump.

Check mark

The quality of vacuum is measured using a suitable micron gauge that has been calibrated.

Run this procedureArrow right

Fan Maintenance

Check mark

The supply, condenser and exhaust fan motors are permanently lubricated and require no periodic lubrication.

Check mark

Each unit as shipped is trim balanced to operate smoothly. To provide satisfactory operation after shipping and installation, use accepted industry guidelines for field balancing fans.

Check mark

NOTE: Excessive vibration from any cause contributes to premature fan and motor bearing failure. Monitor overall vibration levels every six months of operation. An increase in levels is an indication of potential trouble.

Check mark

Vibration Causes

Check mark

Enter the vibration level of the fan

Check mark

Did the fan pass the vibration test?

Check mark

Enter any issues found during the test

Check mark

Sign off on the fan maintenance

Run this procedureArrow right

Parts for Daikin Packaged Rooftop System DPS007AHMY4DW-3

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Furnace Control

VB1200

Gas Safety Control Valve

VR8305Q

Modulating Valve

M520B

Staged Furnace

300049725

Staged Furnace

300049583

Furnace Control

VB1200

Gas Safety Control Valve

VR8305Q

Modulating Valve

M520B

Staged Furnace

300049725

Staged Furnace

300049583

Furnace Control

VB1200

Gas Safety Control Valve

VR8305Q

Modulating Valve

M520B

Staged Furnace

300049725

Staged Furnace

300049583

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets