Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Daikin Packaged Rooftop System DPS007AHMY4DW-3
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
9000 Hours / 6 Monthly Rooftop System Maintenance
Check all moving parts for wear every six months
The Rebel exhaust fans are direct drive variable speed fan/motor combination, which do not have belts or pulleys to maintain
The bearings are permanently sealed and do not require periodic greasing. The Rebel 3-15 ton units have similar supply fans.
The Rebel 16-28 tons supply fans have a direct drive motor
These larger motors are not permanently sealed and will require greasing every 9000 hours
3 Monthly Coated Coil Cleaning
Clean Option E Coated Coils Surfaces
Quarterly cleaning is essential to extend the life of an Option E Coated Coil and is required to maintain warranty coverage
Coil cleaning shall be part of the unit's regularly scheduled maintenance procedures
Failure to clean an Option E Coated Coil will void the warranty and may result in reduced efficiency and durability in the environment
For routine quarterly cleaning, first clean the coil with the below approved coil cleaner
Coil cleaned with approved cleaner?
After cleaning the coils with the approved cleaning agent, use the approved chloride remover (under the Recommended Chloride Remover section) to remove soluble salts and revitalize the unit
Coil cleaned with approved chloride remover?
Sign off on the coil cleaning
Rooftop System Maintenance
Warning: This maintenance requires trained and experienced service technician
Fuel pressure settings and control settings should be made only by persons thoroughly experienced with the burner and control system
Always replace covers on burner controls and boxes as the electrical contacts are sensitive to dust and dirt
Perform maintenance of controls, gas valves, and other components in accordance with instructions in the manufacturer’s bulletins
Installation and maintenance must be performed only by qualified personnel who are experienced with this type of equipment and familiar with local codes and regulations
Gas or Hot Water Piping: A qualified Architect or Systems HVAC Design Engineer familiar with piping design, local codes and regulations, must provide piping design
Moving machinery and electrical power hazards. May cause severe personal injury or death. Disconnect and lock off all power before servicing equipment
Sharp edges are inherent to sheet metal parts, screws, clips, and similar items. May cause personal injury. Exercise caution when servicing equipment
Disconnect all electric power to the unit when servicing control panel components. Before servicing, always inspect units for multiple disconnects to ensure all power is removed from the control panel and its components
Rooftop System Charge Maintenance
Re-charge the unit
The Rebel unit has many configurable options that can affect the refrigerant charge. Actual unit charge is given on the unit's data plate found on the inside of the control panel.
The Rebel unit uses electronic expansion valves that maintain peak efficiency. Liquid sub-cooling and suction super heat float and should not be used as an indication that charge needs to be added or removed from the system.
If a leak is suspected, the full charge should be removed and weighed. Weight should be compared against the unit nameplate data. Unit should be recharged with the amount given on the unit nameplate.
POE and PVE oil is hygroscopic and does absorb moisture when exposed to atmosphere. Steps should be taken to minimize exposure time to atmosphere during any maintenance where the sealed system is to be opened.
Rebel 003-015 refrigerant systems use only Polyvinylether (PVE) oil. Rebel 016-028 refrigerant systems use only Polyester (POE) oil.
NOTICE: Do not use POE oil in DPS 003-015 refrigerant systems and do not use PVE oil in DPS 016-028 refrigerant systems.
The entire system must be evacuated using a suitable vacuum pump.
The quality of vacuum is measured using a suitable micron gauge that has been calibrated.
Fan Maintenance
The supply, condenser and exhaust fan motors are permanently lubricated and require no periodic lubrication.
Each unit as shipped is trim balanced to operate smoothly. To provide satisfactory operation after shipping and installation, use accepted industry guidelines for field balancing fans.
NOTE: Excessive vibration from any cause contributes to premature fan and motor bearing failure. Monitor overall vibration levels every six months of operation. An increase in levels is an indication of potential trouble.
Vibration Causes
Enter the vibration level of the fan
Did the fan pass the vibration test?
Enter any issues found during the test
Sign off on the fan maintenance
Access the parts list for your equipment in MaintainX.
Furnace Control
VB1200
Gas Safety Control Valve
VR8305Q
Modulating Valve
M520B
Staged Furnace
300049725
Staged Furnace
300049583
Furnace Control
VB1200
Gas Safety Control Valve
VR8305Q
Modulating Valve
M520B
Staged Furnace
300049725
Staged Furnace
300049583
Furnace Control
VB1200
Gas Safety Control Valve
VR8305Q
Modulating Valve
M520B
Staged Furnace
300049725
Staged Furnace
300049583
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX