MaintainX Logo
EnterprisePricing
Daikin

Daikin Packaged Rooftop System DPS007AHMY4DW-3

Need answers fast?
Explore the manual using AI.

Daikin Packaged Rooftop System DPS007AHMY4DW-3
Daikin Packaged Rooftop System DPS007AHMY4DW-3

The Daikin Packaged Rooftop System DPS007AHMY4DW-3 is a high-efficiency HVAC solution designed for commercial applications. This robust unit provides reliable heating and cooling, ensuring optimal indoor climate control while minimizing energy consumption. Ideal for various building types, it combines advanced technology with user-friendly features for effective performance.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Packaged Rooftop System DPS007AHMY4DW-3

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Packaged Rooftop System DPS007AHMY4DW-3

Daikin Packaged Rooftop System DPS007AHMY4DW-3

Create an account to install this asset package.

Maintenance Plans for Daikin Packaged Rooftop System Model DPS007AHMY4DW-3

Integrate maintenance plans directly into your work orders in MaintainX.

Fan Maintenance

Check mark

The supply, condenser and exhaust fan motors are permanently lubricated and require no periodic lubrication.

Check mark

Each unit as shipped is trim balanced to operate smoothly. To provide satisfactory operation after shipping and installation, use accepted industry guidelines for field balancing fans.

Check mark

NOTE: Excessive vibration from any cause contributes to premature fan and motor bearing failure. Monitor overall vibration levels every six months of operation. An increase in levels is an indication of potential trouble.

Check mark

Vibration Causes

Check mark

Enter the vibration level of the fan

Check mark

Did the fan pass the vibration test?

Check mark

Enter any issues found during the test

Check mark

Sign off on the fan maintenance

Run this procedureArrow right

2 Weekly Rooftop System Maintenance

Check mark

Prepare for storage control compartment

Check mark

Is the electronic control equipment in the unit stored in a 5% to 95% RH (non-condensing) environment?

Check mark

It may be necessary to put a heat source (light bulb) in the main control panel to prevent the accumulation of atmospheric condensate within the panel. The location and wattage of the heat source is dependent on local environmental conditions

Check mark

Is the heat source in the main control panel functional?

Check mark

Is the heat source adequate for current conditions?

Check mark

Check the control compartment every two weeks to confirm that the heat source is functional and is adequate for current conditions

Check mark

Sign off on the 2 Weekly Rooftop System Maintenance

Run this procedureArrow right

Optional Electric Heater Service

Check mark

CAUTION: Severe loss of charge may occur if the high refrigerant pressure switch is replaced before reclaiming the refrigerant. Replace pressure switch after reclaiming refrigerant

Check mark

DANGER: Hazardous voltage. May cause severe injury or death. Disconnect electric power before servicing equipment. More than one disconnect may be required to de-energize the unit

Check mark

Service Refrigerant Sensors or Switches

Check mark

Service Optional Electric Heater

Check mark

Measure continuity through all fuses

Check mark

Check that all electrical connections are tight. Look for signs of arcing

Check mark

Check the resistance to ground for each circuit. It should be infinite

Check mark

Check the resistance phase to phase for each circuit

Check mark

Check all contactors

Run this procedureArrow right

Phase Voltage Monitor Service

Check mark

Warning: This service requires trained personnel with PPE!

Check mark

Phase voltage monitor functional?

Check mark

If phase voltage monitor is not functional, report the issues to the maintenance team and stop the procedure

Check mark

Voltage (VAC) reading

Check mark

Restart delay (sec)

Check mark

Unbalance trip (%)

Check mark

Trip Delay (sec)

Check mark

Are the readings matching the factory defaults?

Check mark

Issues found during the service

Run this procedureArrow right

Rooftop System Maintenance

Check mark

Warning: This maintenance requires trained and experienced service technician

Check mark

Fuel pressure settings and control settings should be made only by persons thoroughly experienced with the burner and control system

Check mark

Always replace covers on burner controls and boxes as the electrical contacts are sensitive to dust and dirt

Check mark

Perform maintenance of controls, gas valves, and other components in accordance with instructions in the manufacturer’s bulletins

Check mark

Installation and maintenance must be performed only by qualified personnel who are experienced with this type of equipment and familiar with local codes and regulations

Check mark

Gas or Hot Water Piping: A qualified Architect or Systems HVAC Design Engineer familiar with piping design, local codes and regulations, must provide piping design

Check mark

Moving machinery and electrical power hazards. May cause severe personal injury or death. Disconnect and lock off all power before servicing equipment

Check mark

Sharp edges are inherent to sheet metal parts, screws, clips, and similar items. May cause personal injury. Exercise caution when servicing equipment

Check mark

Disconnect all electric power to the unit when servicing control panel components. Before servicing, always inspect units for multiple disconnects to ensure all power is removed from the control panel and its components

Run this procedureArrow right

Parts for Daikin Packaged Rooftop System DPS007AHMY4DW-3

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Furnace Control

VB1200

Modulating Furnace

404231242

LP Gas Furnace

404231245

Staged Furnace

300049725

Natural Gas Fired Furnace

910166417

Furnace Control

VB1200

Modulating Furnace

404231242

LP Gas Furnace

404231245

Staged Furnace

300049725

Natural Gas Fired Furnace

910166417

Furnace Control

VB1200

Modulating Furnace

404231242

LP Gas Furnace

404231245

Staged Furnace

300049725

Natural Gas Fired Furnace

910166417

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets