MaintainX Logo
EnterprisePricing
Daikin

Daikin Packaged Rooftop System DPS003AHMG4DW‐3

Need answers fast?
Explore the manual using AI.

Daikin Packaged Rooftop System DPS003AHMG4DW‐3
Daikin Packaged Rooftop System DPS003AHMG4DW‐3

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Packaged Rooftop System DPS003AHMG4DW‐3

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Packaged Rooftop System DPS003AHMG4DW‐3

Daikin Packaged Rooftop System DPS003AHMG4DW‐3

Create an account to install this asset package.

Maintenance Plans for Daikin Packaged Rooftop System Model DPS003AHMG4DW‐3

Integrate maintenance plans directly into your work orders in MaintainX.

Compressor Ground Fault Interrupter Service

Check mark

Warning: This service requires trained personnel with PPE!

Check mark

Is the current sensing donut on the power wires to the compressor(s) functional?

Check mark

Is the PCB functional?

Check mark

Is the device monitoring the balance between the three phase power and the neutral conductor?

Check mark

Note: The device is not intended to provide overcurrent or short circuit protection to the equipment.

Check mark

Is the device opening the 120V controls circuit in a fault condition?

Check mark

Is there an open condition on the ground fault interrupter?

Check mark

Report any issues found during the service

Check mark

Sign off on the Compressor Ground Fault Interrupter Service

Run this procedureArrow right

2 Weekly Rooftop System Maintenance

Check mark

Prepare for storage control compartment

Check mark

Is the electronic control equipment in the unit stored in a 5% to 95% RH (non-condensing) environment?

Check mark

It may be necessary to put a heat source (light bulb) in the main control panel to prevent the accumulation of atmospheric condensate within the panel. The location and wattage of the heat source is dependent on local environmental conditions

Check mark

Is the heat source functional?

Check mark

Is the heat source adequate for current conditions?

Run this procedureArrow right

Optional Electric Heater Service

Check mark

CAUTION: Severe loss of charge may occur if the high refrigerant pressure switch is replaced before reclaiming the refrigerant. Replace pressure switch after reclaiming refrigerant

Check mark

DANGER: Hazardous voltage. May cause severe injury or death. Disconnect electric power before servicing equipment. More than one disconnect may be required to de-energize the unit

Check mark

Service Refrigerant Sensors or Switches

Check mark

Service Optional Electric Heater

Check mark

Measure continuity through all fuses

Check mark

Check that all electrical connections are tight. Look for signs of arcing

Check mark

Check the resistance to ground for each circuit. It should be infinite

Check mark

Check the resistance phase to phase for each circuit

Check mark

Check all contactors

Run this procedureArrow right

Phase Voltage Monitor Service

Check mark

Warning: This service requires trained personnel with PPE!

Check mark

Phase voltage monitor functional?

Check mark

If phase voltage monitor is not functional, report the issues to the maintenance team and stop the procedure

Check mark

Voltage (VAC) reading

Check mark

Restart (sec) reading

Check mark

Unbalance trip (%) reading

Check mark

Trip Delay (sec) reading

Check mark

Are the readings matching the factory defaults?

Check mark

Issues found during the service

Run this procedureArrow right

Filter Replacement

Check mark

Select cabinet size

Check mark

Select filter size based on cabinet size

Check mark

Filter replaced successfully

Check mark

Sign off on the filter replacement

Run this procedureArrow right

Parts for Daikin Packaged Rooftop System DPS003AHMG4DW‐3

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Furnace Control

VB1200

Gas Safety Control Valve

VR8305Q

Modulating Valve

M520B

Staged Furnace

300049725

Staged Furnace

300049583

Furnace Control

VB1200

Gas Safety Control Valve

VR8305Q

Modulating Valve

M520B

Staged Furnace

300049725

Staged Furnace

300049583

Furnace Control

VB1200

Gas Safety Control Valve

VR8305Q

Modulating Valve

M520B

Staged Furnace

300049725

Staged Furnace

300049583

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets