MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG09QVJUW

Need answers fast?
Explore the manual using AI.

Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG09QVJUW
Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG09QVJUW

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG09QVJUW

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG09QVJUW

Daikin Indoor Unit Multi-Split Type Air Conditioner CTXG09QVJUW

Create an account to install this asset package.

Maintenance Plans for Daikin Indoor Unit Multi-Split Type Air Conditioner Model CTXG09QVJUW

Integrate maintenance plans directly into your work orders in MaintainX.

Main Circuit Short Check

Check mark

Warning: Ensure the voltage between (+) and (–) of the diode bridge (DB1) is about 0 V before proceeding

Check mark

Enter the voltage between (+) and (–) of the diode bridge (DB1)

Check mark

Measure the resistance between the pins of the DB1 referring to the table below.

Check mark

Enter the resistance between the pins of the DB1

Check mark

Is the resistance ∞ or less than 1 kΩ?

Check mark

If the resistance is ∞ or less than 1 kΩ, short circuit occurs on the main circuit.

Check mark

Sign off on the main circuit short check

Run this procedureArrow right

Thermistor Resistance Check

Check mark

Warning: Disconnect the connectors of the thermistors from the PCB before proceeding

Check mark

Thermistors disconnected from the PCB

Check mark

Measure the resistance of each thermistor using a multimeter

Check mark

When the room temperature thermistor is soldered on a PCB, remove the PCB from the control PCB to measure the resistance

Check mark

PCB removed from the control PCB

Check mark

Measure the resistance of the room temperature thermistor

Check mark

When the connector of indoor heat exchanger thermistor is soldered on a PCB, remove the thermistor and measure the resistance

Check mark

Indoor heat exchanger thermistor removed

Check mark

Measure the resistance of the indoor heat exchanger thermistor

Run this procedureArrow right

Power Module Check

Check mark

Warning: Ensure the voltage between (+) and (-) of the power module is about 0 V before proceeding

Check mark

Voltage between (+) and (-) of the power module is about 0 V

Check mark

Disconnect the compressor harness connector from the outdoor unit PCB. To disengage the connector, press the protrusion on the connector.

Check mark

Compressor harness connector disconnected

Check mark

Measure resistance between the (+) or (-) terminal of the power module and the U, V, or W terminal of the compressor with a multimeter.

Check mark

Enter the resistance measurement

Check mark

Evaluate the measurement results

Check mark

Sign off on the power module check

Run this procedureArrow right

Power Supply Waveform Check

Check mark

Warning: This check requires trained personnel with PPE!

Check mark

Measure the power supply waveform between No. 1 and No. 2 on the terminal board

Check mark

Upload a photo of the measured waveform

Check mark

Is the power supply waveform a sine wave?

Check mark

Is there waveform disturbance near the zero-cross?

Check mark

Sign off on the power supply waveform check

Run this procedureArrow right

Indoor Fan Motor Connector Check

Check mark

CTXG, CTXS, FTXS, FVXS Series

Check mark

1. Check the connection of connector.

Check mark

2. Check motor power supply voltage output (pins 4 - 7).

Check mark

3. Check motor control voltage (pins 4 - 3).

Check mark

4. Check rotation command voltage output (pins 4 - 2).

Check mark

5. Check rotation pulse input (pins 4 - 1).

Check mark

FFQ Series

Check mark

1. Check the connection of connector.

Check mark

2. Check motor power supply voltage output (pins 5 - 8).

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets