MaintainX Logo
EnterprisePricing
Carrier

Carrier Outdoor Unit Single Zone Ductless System 38MARBQ30AA3

Need answers fast?
Explore the manual using AI.

Carrier Outdoor Unit Single Zone Ductless System 38MARBQ30AA3
Carrier Outdoor Unit Single Zone Ductless System 38MARBQ30AA3

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Carrier Outdoor Unit Single Zone Ductless System 38MARBQ30AA3

Carrier Outdoor Unit Single Zone Ductless System 38MARBQ30AA3

Create an account to install this asset package.

Maintenance Plans for Carrier Outdoor Unit Single Zone Ductless System Model 38MARBQ30AA3

Integrate maintenance plans directly into your work orders in MaintainX.

IPM Continuity Check

Check mark

WARNING: ELECTRICAL SHOCK HAZARD. Electricity remains in the capacitors even when the power is off. Ensure the capacitors are fully discharged before troubleshooting.

Check mark

Outdoor unit turned off and power supply disconnected

Check mark

Electrolytic capacitors fully discharged and all energy has been discharged

Check mark

Outdoor PCB or IPM board dissembled

Check mark

Measure the resistance valve between P and U(V,W,N)

Check mark

Measure the resistance valve between U(V,W) and N

Check mark

Sign off on the IPM Continuity Check

Run this procedureArrow right

Compressor Check

Check mark

Disconnect the compressor power cord from the outdoor PCB

Check mark

Measure the resistance valve of each winding using a multi-meter

Check mark

Check the resistance valve of each winding in Tables 21 - 21

Run this procedureArrow right

Main Parts Check

Check mark

Temperature sensor checking

Check mark

Disconnect the temperature sensor from PCB

Check mark

Measure the resistance value with a tester

Check mark

Temperature sensors

Check mark

Measure the resistance value of each winding by using the multi-meter

Run this procedureArrow right

Temperature Sensor Check

Check mark

WARNING: Be sure to turn off all power supplies or disconnect all wires to avoid shock. Operate after the compressor and coil have returned to a normal temperature in case of injury.

Check mark

Temperature sensor disconnected from PCB

Check mark

Sensor’s resistance value

Check mark

Upload a photo of the multi-meter reading

Check mark

Check the corresponding temperature sensor’s resistance value table

Check mark

Sign off on the temperature sensor check

Run this procedureArrow right

EXV Check

Check mark

WARNING: ELECTRICAL SHOCK HAZARD. Electricity remains in the capacitors even when the power is off. Ensure the capacitors are fully discharged before troubleshooting.

Check mark

Disconnect the connector from the outdoor PCB.

Check mark

Measure the resistance value of each winding using a multi-meter.

Check mark

Check the resistance value of each winding

Check mark

Sign off on the EXV Check

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Carrier

Explore Other Assets