

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

BD Biosciences Cell Sorter 662937A0
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Weekly Fluidics Shutdown Maintenance
Preparing for Shutdown
Unload the sample tube
Turn off the stream
Check the waste container and empty it if needed
Check the ethanol shutdown tank and refill it if needed
Running Fluidics Shutdown
Select Cytometer > Fluidics Shutdown
Put the lasers in standby and close the laser control software
Remove the nozzle from the flow cell assembly
1 Daily Shutdown Maintenance
BD FACSymphony S6 cell sorter system daily shutdown procedure
Run the Clean Flow Cell command with the closed-loop nozzle installed
Fill the flow cell with cleaning solution
Perform an external cleaning
Cleaning the Flow Cell (Daily)
Turn off the stream
Put the lasers in standby and close the laser control software
Remove the nozzle and install the integrated closed-loop nozzle
Select Cytometer > Cleaning Modes > Clean Flow Cell
Closed-Loop Nozzle Maintenance
Cleaning the Integrated Closed-Loop Nozzle
Lasers in standby and laser control software closed
Stream turned off and flow cell access door opened
Closed-loop nozzle removed from the cuvette flow cell
Nut on the side of the nozzle unscrewed and tubing removed
Nozzle sonicated for approximately 1 minute
Ferrule on the tubing and nut screwed back into the hole in the nozzle
Replacing the Tubing on the Closed-Loop Nozzle
Nut unscrewed from the closed-loop nozzle and from the union fitting and tubing removed
1 Monthly Cell Sorter Maintenance
Changing the disposable waste cap (see Emptying the Waste Container on page 137)
Emptying the Waste Container
Empty the waste container daily and when the fluid indicator shows the waste is getting full. To prolong the life of the container, we recommend that you switch to the alternate container each time the waste is emptied.
To ensure that the appropriate solutions are dispensed, do not switch the tank positions. Make sure the label on each container matches the labeled port on the fluidics drawer.
All biological specimens and materials coming into contact with them can transmit potentially fatal disease. To prevent exposure to biohazardous agents, expose waste container contents to bleach (10% of total volume) before disposal. Dispose of waste in accordance with local regulations. Use proper precautions and wear suitable protective clothing, eyewear, and gloves.
Change the waste container cap every month, or when it has gotten wet, to prevent container pressurization. To order new replacement caps, contact your local BD Biosciences representative.
1 Disconnect the waste container’s sensor and fluid line connectors from the connector panel in the fluidics drawer.
The waste container can become pressurized when the cytometer is running. Always disconnect the container from the connectors panel before you empty it. Wait at least 1 minute for pressure to dissipate before you open the container.
2 Remove the disposable waste cap (large-sized cap) and attached trap from the container. Place the assembly on the bench label-side up.
Deflection Plate Removal
Warning: Use the Stop button in the laser control software to put the lasers in standby and then close the laser control software. This will turn off the laser diode, but will keep the diode temperature constant.
Lasers in standby?
Deflection plates turned off?
Sort block door opened?
Slide the deflection plate removal tool behind one of the plates and pull straight out from the sort block.
Deflection plate removed successfully?
Sign off on the deflection plate removal
Access the parts list for your equipment in MaintainX.
Standard O-Rings
333084
1-Ml Microtube Holder
333457
12 X 75-Mm Test Tube Holder
333456
15-Ml Centrifuge Tube Holder
333430
Four-Way 1.5-Ml Eppendorf Collection Tube Holder
644349
Standard O-Rings
333084
1-Ml Microtube Holder
333457
12 X 75-Mm Test Tube Holder
333456
15-Ml Centrifuge Tube Holder
333430
Four-Way 1.5-Ml Eppendorf Collection Tube Holder
644349
Standard O-Rings
333084
1-Ml Microtube Holder
333457
12 X 75-Mm Test Tube Holder
333456
15-Ml Centrifuge Tube Holder
333430
Four-Way 1.5-Ml Eppendorf Collection Tube Holder
644349
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













