MaintainX Asset Hub logo
EnterprisePricing
Ariel

Ariel Heavy Duty Balanced Opposed Compressor JGP/2

Need answers fast?
Explore the manual using AI.

Ariel Heavy Duty Balanced Opposed Compressor JGP/2
Ariel Heavy Duty Balanced Opposed Compressor JGP/2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ariel Heavy Duty Balanced Opposed Compressor JGP/2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ariel Heavy Duty Balanced Opposed Compressor JGP/2

Ariel Heavy Duty Balanced Opposed Compressor JGP/2

Create an account to install this asset package.

Maintenance Plans for Ariel Heavy Duty Balanced Opposed Compressor Model JGP/2

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Compressor Maintenance

Check mark

Warning: Ensure all power to the Unit is shut off and the Tank is drained of air pressure before servicing the Air Compressor.

Check mark

Insist on Genuine parts and kits when maintaining your Compressor Unit and Pump.

Check mark

Normal Maintenance

Check mark

Hot alignment check at coupling within 30 minutes performed?

Check mark

Fastener torque on gas nozzle flange, valve cap, cylinder head, compressor rod; packing flange and, if applicable, crosshead guide to frame bolting checked?

Check mark

Bearing temperatures and crankcase visual inspection performed?

Check mark

Frame oil pressure

Check mark

Frame oil level checked?

Check mark

Lubricator block cycle time checked?

Run this procedureArrow right

32000 Hourly / 4 Yearly Compressor Maintenance

Check mark

Check crosshead pin to crosshead pin bore and connecting rod bushing bore by removing crosshead pins.

Check mark

Check for excessive wear in the auxiliary end drive chain tightener.

Check mark

Check for excessive ring groove wear in pistons.

Check mark

Sign off on the compressor maintenance

Run this procedureArrow right

4000 Hourly / 6 Monthly Compressor Maintenance

Check mark

Drain and replace lubricator box oil.

Check mark

Change oil filter or when oil filter differential pressure exceeds the filter change value.

Check mark

Change oil.

Check mark

Clean sintered element in the small oil filter supplied on the force feed lubrication system or every time main oil filter is changed.

Check mark

Clean strainer when oil is changed.

Check mark

Open frame when oil is changed and visually inspect for foreign material.

Check mark

Check fluid level in torsional vibration damper (if applicable). Take fluid sample for viscosity testing.

Check mark

Re-tighten hold down stud-nuts to proper torque values.

Check mark

Realign if necessary to hold coupling hub face and rim hot alignment within 0.005 inch (0.13 mm) TIR.

Run this procedureArrow right

650 Hourly / 1 Monthly Compressor Maintenance

Check mark

Safety First! Ensure the compressor is shut down and the gas system is vented before starting.

Check mark

Fastener torque on gas nozzle flanges, valve caps, cylinder heads and compressor rod packing flanges checked and confirmed?

Check mark

Fasteners that turn at the first month check, should be re-checked after the second month or 1300 hours. If loosening persists, consult your packager or Ariel to help determine the cause and recommend the correction.

Check mark

Safety shutdown functions checked and confirmed?

Check mark

Upload the frame oil sample analysis report

Check mark

If the oil analysis results indicate, change oil. If an oil analysis indicates lead, tin or copper particles in the oil, check main, connecting rod and crankshaft-thrust bearing clearances.

Check mark

Bearing clearances checked and within limits?

Check mark

Sign off on the compressor maintenance

Run this procedureArrow right

8000 Hourly / 1 Yearly Compressor Maintenance

Check mark

Check main, connecting rod, and crankshaft-thrust bearing clearances with a pry bar and dial indicator.

Check mark

Check crosshead guide clearance with feelers.

Check mark

Inspect valves for broken plates and loose center bolts.

Check mark

Inspect cylinder bores for damage or wear.

Check mark

Inspect piston ring end gap.

Check mark

Inspect piston rods for damage and excessive wear.

Check mark

Rebuild cylinder packing cases.

Check mark

Check and re-calibrate all temperature and pressure gauges.

Check mark

Check and record compressor rod run out.

Run this procedureArrow right

Parts for Ariel Heavy Duty Balanced Opposed Compressor JGP/2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Balance Valve Internal Assembly With A Plug Assembly

A-10330

Battery Ariel

A-10807

Battery Radio Shack

960-0418

Electronic Lubricator Fluid-Flow Monitor

A-11295

Main Bearing Pusher Removal Tool

G-10706

Balance Valve Internal Assembly With A Plug Assembly

A-10330

Battery Ariel

A-10807

Battery Radio Shack

960-0418

Electronic Lubricator Fluid-Flow Monitor

A-11295

Main Bearing Pusher Removal Tool

G-10706

Balance Valve Internal Assembly With A Plug Assembly

A-10330

Battery Ariel

A-10807

Battery Radio Shack

960-0418

Electronic Lubricator Fluid-Flow Monitor

A-11295

Main Bearing Pusher Removal Tool

G-10706

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ariel

Explore Other Assets