Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Alfa Laval Air Actuated Tank Outlet Valve 762-57M-10S-X-316L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Valve Bushing/Packing Replacement
Warning: Disconnect and remove actuator completely from valve before proceeding
Bushing and packing failure check
If one end fails, both ends of the actuator should be serviced
Upload a photo of the removed actuator
Check for worn or damaged components
Replace all worn or damaged components as required
Spray stem and o- ring with Sanitary Lubricant
Check if all valve bodies are mated properly
Check if all clamps are tightened securely
Actuator Stem Replacement
Warning: Ensure the valve stem is secured before proceeding
Nylon Locking Pin located in the middle of the stem thread?
Nylon Locking Pin replaced after disassembly?
Old nylon pin punched out with an 1/8 inch or smaller diameter punch?
New nylon locking pin inserted?
Sign off on the actuator stem replacement
Valve Inspection
Inspect Valve Body Seat(s) for nicks and scratches and other signs of excessive wear
Inspect Valve Stem & Seat(s) rubber or PTFE seat(s) for signs of cracking, tearing, checking, or excessive wear
Inspect stem finish for galling, nicks, or scratches
Inspect Split Bushing for signs of cracks, nicks, scratches or excessive wear on inside diameter
Inspect O-ring(s) for cuts, abrasions, flat spots, or other damage
Upload a photo of the inspected valve
Sign off on the valve inspection
1 Yearly Actuator Lubrication
Warning: Over lubrication is not a remedy for actuator failure
Select the type of oil used
Oil injected into the unthreaded thru hole in each end of the actuator
Actuator rolled on a flat surface for uniform coverage
Over lubrication avoided
Sign off on the actuator lubrication
Access the parts list for your equipment in MaintainX.
Actuator
25-436-S
Stem Protector
25-436-08
Yoke
12-496-S
Seal Retainer
25-428-05
V-Packing
17-98
Actuator
25-436-S
Stem Protector
25-436-08
Yoke
12-496-S
Seal Retainer
25-428-05
V-Packing
17-98
Actuator
25-436-S
Stem Protector
25-436-08
Yoke
12-496-S
Seal Retainer
25-428-05
V-Packing
17-98
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX