Airedale International Air Conditioning Free-Cooling Chiller UCFC360D-10/2

Need answers fast?
Explore the manual using AI.

Airedale International Air Conditioning Free-Cooling Chiller UCFC360D-10/2
Airedale International Air Conditioning Free-Cooling Chiller UCFC360D-10/2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Airedale International Air Conditioning Free-Cooling Chiller UCFC360D-10/2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Airedale International Air Conditioning Free-Cooling Chiller UCFC360D-10/2

Airedale International Air Conditioning Free-Cooling Chiller UCFC360D-10/2

Create an account to install this asset package.

Maintenance Plans for Airedale International Air Conditioning Free-Cooling Chiller Model UCFC360D-10/2

Integrate maintenance plans directly into your work orders in MaintainX.

12 Monthly Chiller Maintenance

Check mark

CAUTION!

Check mark

Repeat 6 Month Checks

Check mark

List all 6 month checks completed

Check mark

12 Month Specific Checks

Check mark

Check safety devices cut out the compressor at the correct settings

Check mark

Tighten all electrical terminals

Run this procedureArrow right

12 Monthly Refrigeration System Maintenance

Check mark

CAUTION!

Check mark

Pre-Maintenance Safety Check

Check mark

Ensure all electrical and moving parts are isolated before starting maintenance.

Check mark

System Checks

Check mark

Check glycol concentration if appropriate.

Check mark

Leak test all R407C joints and inspect all water connections.

Check mark

Check superheats with chiller running on full load.

Check mark

Recheck the charge following major adjustment of the superheats.

Check mark

Adjustment and Rectification

Run this procedureArrow right

3 Monthly Chiller Maintenance

Check mark

Safety Precautions

Check mark

Ensure all work is carried out by technically trained competent personnel

Check mark

Isolate equipment to ensure no live electrical or moving parts are active

Check mark

Visual Inspection

Check mark

Inspect the unit for general wear and tear and treat metalwork as necessary

Check mark

Inspect pipe and pipework insulation for any damage

Check mark

Cleaning Tasks

Check mark

Clean evaporator water strainer

Check mark

Clean condenser coils using detergent and a stiff bristled brush. Avoid steam cleaning. For heavy dirt, use a high pressure water or chemical hose

Run this procedureArrow right

6 Monthly Chiller Maintenance

Check mark

CAUTION!

Check mark

3 Month Checks

Check mark

Perform all 3 month checks

Check mark

Evaporator and Thermostat Check

Check mark

Check evaporator trace heating activation temperature

Check mark

Check low ambient thermostat activation temperature

Check mark

Final Steps

Check mark

Re-cap the Schraeder connections

Run this procedureArrow right

3 Monthly Chiller System Check

Check mark

Safety Precautions

Check mark

Ensure all work is carried out by technically trained competent personnel

Check mark

Isolate equipment to ensure safety from live electrical and moving parts

Check mark

Commissioning Records Verification

Check mark

Verify the following against the commissioning records

Check mark

Chilled Water System Check

Check mark

Ensure chilled water pump operates efficiently

Check mark

Ensure flow switch operates efficiently

Check mark

Verify interlocks function correctly

Run this procedureArrow right

Parts for Airedale International Air Conditioning Free-Cooling Chiller UCFC360D-10/2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Water Flange Connections: UCFC275-450

DN100 PN16

Water Flange Connections: UCFC275-450

DN100 PN16

Water Flange Connections: UCFC275-450

DN100 PN16

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Airedale International Air Conditioning

Explore Other Assets