Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Airedale International Air Conditioning Free-Cooling Chiller UCFC360DQ-12/2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
6 Monthly Chiller Maintenance
Safety Precautions
Ensure all work is carried out by technically trained competent personnel
Isolate equipment to ensure no live electrical or moving parts are active
3 Month Checks
Repeat 3 month checks
6 Month Specific Checks
Check evaporator trace heating activation temperature
Check low ambient thermostat activation temperature
Are both the evaporator trace heating and low ambient thermostat set to activate at 4.0°C?
3 Monthly Chiller Maintenance
CAUTION!
Visual Inspection
Inspect the unit for general wear and tear, treat metalwork.
Inspect pipe and pipework insulation.
Cleaning Tasks
Clean evaporator water strainer.
Clean condenser coils using detergent and stiff bristled brush. Avoid steam cleaning.
For heavy dirt on condenser coils, choose cleaning method.
Visual Checks
3 Monthly Chiller System Check
CAUTION!
Check against commissioning records
Control settings verified against commissioning records
Alarm log checked for unusual occurrences
Chilled water control maintains design temperature
Chilled water flow is within design limits of zero to plus 10%
Chilled water pump and flow switch operate efficiently
Interlocks function correctly
Operation of waterflow switch and pump interlock
7500 Hourly / 4 Yearly Compressor Oil Inspection
Safety Precautions
Ensure all work is carried out by technically trained competent personnel
Isolate equipment to prevent electrical and mechanical hazards
Compressor Oil Inspection
Record the current operating hours of the compressor
Has the compressor reached 7,500 hours or 4 years of operation?
Inspect the condition of the compressor oil
Is the compressor oil in acceptable condition?
Describe any issues found with the compressor oil
3 Monthly Refrigeration System Check
CAUTION!
Pre-Inspection
Isolate the equipment before starting maintenance
Inspection and Measurements
Enter the suction reading
Enter the discharge reading
Is the head pressure control maintained?
Enter the pressure relief indicator gauge reading
Check each circuit sight glass for dryness and bubbles
Access the parts list for your equipment in MaintainX.
Water Flange Connections: UCFC275-450
DN100 PN16
Water Flange Connections: UCFC275-450
DN100 PN16
Water Flange Connections: UCFC275-450
DN100 PN16
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX