Airedale International Air Conditioning Free-Cooling Chiller UCFC250DQ-8/2
Airedale International Air Conditioning Free-Cooling Chiller UCFC250DQ-8/2

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Airedale International Air Conditioning Free-Cooling Chiller UCFC250DQ-8/2

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Airedale International Air Conditioning Free-Cooling Chiller UCFC250DQ-8/2

Airedale International Air Conditioning Free-Cooling Chiller UCFC250DQ-8/2

Create an account to install this asset package.

Maintenance Plans for Airedale International Air Conditioning Free-Cooling Chiller Model UCFC250DQ-8/2

Integrate maintenance plans directly into your work orders in MaintainX.

3 Monthly Refrigeration System Check

Check mark

CAUTION!

Check mark

Pre-Inspection Safety

Check mark

Ensure the system is isolated from electrical supply

Check mark

System Checks

Check mark

Record suction reading

Check mark

Record discharge reading

Check mark

Is head pressure control maintained?

Check mark

Check pressure relief indicator gauge

Check mark

Check each circuit sight glass for dryness and bubbles

Run this procedureArrow right

12 Monthly Chiller Maintenance

Check mark

Safety Precautions

Check mark

Ensure all work is carried out by technically trained competent personnel

Check mark

Isolate equipment to ensure no live electrical or moving parts are active

Check mark

6 Month Checks

Check mark

Repeat 6 month checks

Check mark

12 Month Specific Checks

Check mark

Check safety devices cut out the compressor at the correct settings

Check mark

Tighten all electrical terminals

Run this procedureArrow right

6 Monthly Chiller Maintenance

Check mark

CAUTION!

Check mark

3 Month Checks

Check mark

Perform all 3 month checks

Check mark

Evaporator and Thermostat Check

Check mark

Check evaporator trace heating activation temperature

Check mark

Check low ambient thermostat activation temperature

Check mark

Final Steps

Check mark

Re-cap the Schraeder connections

Run this procedureArrow right

7500 Hourly / 4 Yearly Compressor Oil Inspection

Check mark

CAUTION!

Check mark

Pre-Inspection Safety Measures

Check mark

Ensure the equipment is isolated from electrical sources

Check mark

Verify that all moving parts are stationary

Check mark

Compressor Oil Inspection

Check mark

Record the current operating hours of the compressor

Check mark

Has the compressor reached 7,500 hours or 4 years of operation?

Check mark

Inspect the condition of the compressor oil

Check mark

Is the oil in acceptable condition?

Run this procedureArrow right

3 Monthly Chiller Maintenance

Check mark

Safety Precautions

Check mark

Ensure all work is carried out by technically trained competent personnel.

Check mark

Isolate equipment to ensure no live electrical or moving parts are active before maintenance or repair work.

Check mark

Visual Inspection

Check mark

Visually inspect the unit for general wear and tear.

Check mark

Treat metalwork for any signs of rust or damage.

Check mark

Visually inspect pipe and pipework insulation.

Check mark

Cleaning Tasks

Check mark

Clean evaporator water strainer.

Run this procedureArrow right

Parts for Airedale International Air Conditioning Free-Cooling Chiller UCFC250DQ-8/2

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Water Flange Connections: UCFC160-250

DN80 PN16

Water Flange Connections: UCFC160-250

DN80 PN16

Water Flange Connections: UCFC160-250

DN80 PN16

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Airedale International Air Conditioning

Explore Other Assets