Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Airedale International Air Conditioning Free-Cooling Chiller UCFC300D-8/2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Refrigeration System Check
CAUTION!
Initial Checks
Record suction reading
Record discharge reading
Is head pressure control maintained?
Check pressure relief indicator gauge
Circuit and Compressor Inspection
Check each circuit sight glass for dryness and bubbles
Check compressor oil level
3 Monthly Chiller Maintenance
Safety Precautions
Ensure all work is carried out by technically trained competent personnel.
Isolate equipment to ensure no live electrical or moving parts are active before maintenance or repair work.
Visual Inspection
Inspect the unit for general wear and tear and treat metalwork as necessary.
Inspect pipe and pipework insulation for any damage or wear.
Cleaning Tasks
Clean evaporator water strainer.
Clean condenser coils using detergent and a stiff bristled brush. Avoid steam cleaning.
6 Monthly Chiller Maintenance
CAUTION!
3 Month Checks
Check evaporator trace heating and low ambient thermostat are set to activate at 4.0°C.
Remember to re-cap the Schraeder connections!
12 Monthly Chiller Maintenance
Safety Precautions
Ensure all work is carried out by technically trained competent personnel
Isolate equipment to ensure no live electrical or moving parts are active before maintenance or repair work
Repeat 6 Month Checks
Check safety devices cut out the compressor at the correct settings
Tighten all electrical terminals
1 Yearly Compressor Maintenance
CAUTION!
Periodic Maintenance and Inspection
Measure compressor motor insulation
Shutdown Periods Precautions
Perform the following shutdown precautions
Access the parts list for your equipment in MaintainX.
Water Flange Connections: UCFC275-450
DN100 PN16
Water Flange Connections: UCFC275-450
DN100 PN16
Water Flange Connections: UCFC275-450
DN100 PN16
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX