

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

ABB Charging Station Terra 124 CC
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Monthly Charging Station Cleaning
Safety Precautions
Ensure only authorized or trained personnel perform maintenance
De-energize the EVSE before maintenance activities
Visual Inspection
Inspect external parts of the EVSE for any visible damage or wear
Cleaning External Parts
Use cleaning agent with pH value between 6 and 8
Avoid using abrasive tools
Do not apply high-pressure water jets
3 Monthly Charging Station Inspection
Visual Inspection on External Parts
Inspect the external parts of the EVSE for any damage or issues
Are there any obstacles (animals, insects, leaves, etc.) reducing the heat exchanging capacity of the EVSE?
Safety and Maintenance Precautions
Ensure only authorized or trained personnel perform operations inside the EVSE
Refer to section '9.3. Total de-energization of the EVSE' for de-energizing procedures
Routine Maintenance and Component Replacement
Review routine maintenance schedule based on environmental conditions and number of charging sessions
Contact ABB E-mobility for information on scheduled component replacement and Service Level Agreements
3 Monthly Charging Station Check
Pre-maintenance Safety Precautions
Ensure only authorized or trained personnel perform the maintenance
De-energize the EVSE for maintenance activities as per section 9.3
Functionality Checks
Check the functionality of the following components
Routine Maintenance and Component Replacement
Record any environmental conditions affecting the maintenance schedule
Record the number of charging sessions since last maintenance
Schedule component replacement to ensure continuity of operation
1 Yearly Charging Station Filter Maintenance
Pre-Maintenance Safety Checks
Ensure that only authorized or trained personnel are performing the maintenance
Verify that the EVSE is de-energized
Filter Maintenance
Clean or replace the internal parts of the EVSE
Post-Maintenance Verification
Confirm that the maintenance activity is not included in the Service Level Agreement (SLA)
Verify completion of the dedicated course by ABB E-mobility
Access the parts list for your equipment in MaintainX.
Grounding Kit, KFP 20 M10
754205
Grounding Kit, KFP 20 M12
754200
Grounding Kit, KKH 20 FS
772312
Grounding Kit, UK 25 SK
773 034
Grounding Kit, KFP 20 M10
754205
Grounding Kit, KFP 20 M12
754200
Grounding Kit, KKH 20 FS
772312
Grounding Kit, UK 25 SK
773 034
Grounding Kit, KFP 20 M10
754205
Grounding Kit, KFP 20 M12
754200
Grounding Kit, KKH 20 FS
772312
Grounding Kit, UK 25 SK
773 034
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













