

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Rooftop Unit ZH049E20D5B5BCA2A2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Air Quantity Check
Pre-Check Adjustments
Verify proper sheave alignment
Tighten blower pulley and motor sheave set screws
Re-check set screws after 10-12 hours run time
Method One: Checking Air Quantity
Remove the dot plugs from the duct panel
Insert eight inches of 1/4 inch metal tubing into the airflow on both sides of the indoor coil
Determine the pressure drop across a dry evaporator coil using an Inclined Manometer or Magnehelic
Ensure compressors are de-energized before taking measurements
Rooftop Unit Prestart Check
Prestart Check List
Check the electrical supply voltage being supplied
Set the room thermostat to the off position
Turn unit electrical power on
Set the room thermostat fan switch to on
Check indoor blower rotation
Check blower drive belt tension
Check the unit supply air (CFM)
Measure evaporator fan motor's amp draw
Supply Air Drive Adjustment
Pre-Adjustment Checks
Review installation for errors, leaks, or undesirable system effects
Verify qualified personnel are performing the adjustment
Blower Speed Adjustment
Enter the required CFM
Enter the measured CFM
Enter the existing datum diameter (DD) of the motor sheave
Calculate the new datum diameter (DD) using the formula: Required CFM / Measured CFM × Existing DD
Adjust the motor variable pitch sheave to the new DD
Access the parts list for your equipment in MaintainX.
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Non-Plenum Anixter O.D. 0.138 In.
CBL-22/3-FC-PVC
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Non-Plenum Belden O.D. 0.138 In.
B5501FE
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Plenum Anixter O.D. 0.140 In.
CBL-22/3-FC-PLN
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Non-Plenum Anixter O.D. 0.138 In.
CBL-22/3-FC-PVC
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Non-Plenum Belden O.D. 0.138 In.
B5501FE
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Plenum Anixter O.D. 0.140 In.
CBL-22/3-FC-PLN
Optional CO2 Space Sensor Kit
2AQ04700524
Optional CO2 Sensor Kit
2AQ04700624
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Non-Plenum Anixter O.D. 0.138 In.
CBL-22/3-FC-PVC
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Non-Plenum Belden O.D. 0.138 In.
B5501FE
22 Awg Stranded 3-Wire Twisted Shielded Cable FC Bus Plenum Anixter O.D. 0.140 In.
CBL-22/3-FC-PLN
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













