Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

York Screw Chiller YCIV0187PA46
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Chiller Soap Visual Gas Leak Test
Warning: This procedure requires trained personnel with PPE!
Enter the system pressure
All system valves including manual valves and EEVs are 100% open
All valves to the atmosphere are closed with flare caps in place
Enter the unit's initial evacuation level
Enter the system pressure after charging with dry nitrogen
Soap and water solution prepared
Soap solution test performed on each unit fitting joint and weld seams
Ultrasonic leak detector used
1 Yearly Chiller Maintenance
This procedure must be performed at the specified time by an industry certified technician who has been trained and qualified to work on this type of equipment.
A record of this procedure being successfully carried out should be maintained on file by the equipment owner should proof of adequate maintenance be required at a later date for warranty purposes.
Sample compressor oil, check for acid, and replace if necessary.
Disconnect power source and lock out and check tightness of power wiring connections.
Check glycol concentration on low temperature or other applications where freezing may be a problem.
Sign off on the 1 Yearly Chiller Maintenance
1 Daily Chiller Maintenance
Daily maintenance
The following maintenance checks should be carried out on a daily basis by the operator/customer
The units are not generally user serviceable
No attempt should be made to rectify faults or problems found during daily checks unless competent and equipped to do so
If in any doubt, contact your local Johnson Controls Service Agent
Unit status: Press the STATUS key on the keypad and ensure no fault messages are displayed
Operating conditions: Read the operating pressures and temperatures at the control panel using the display keys
Check that these are within the operating limitations given in the manual
Compressor oil level: Check the compressor oil level after the compressor has been operating on FULL LOAD for approximately half an hour
6 Monthly Chiller Check
This procedure must be performed at the specified time by an industry certified technician who has been trained and qualified to work on this type of equipment
A record of this procedure being successfully carried out should be maintained on file by the equipment owner should proof of adequate maintenance be required at a later date for warranty purposes
Check superheat on the evaporator and the economizer feed to the compressor
Check condenser subcooling
Leak check the chiller
Technician's signature
Chiller Leak Testing
Warning: This procedure should only be performed by a qualified technician.
Leak Testing
Has the system been carefully pressure tested and evacuated at the factory?
Enter the leak rate (acceptable limit is 0.1 oz/year at DWP)
Are all joints tight and leak-free?
If any leaks are indicated, they must be repaired immediately.
Can leaks be stopped by ensuring that face seal nuts and flange bolts are correctly torqued?
For any major repair, the refrigerant charge must be removed and the system leak checked using reliable methods like a pressure test.
Leak Testing During Operation
Access the parts list for your equipment in MaintainX.
York Coolant, Approved Coolant
013-03344-000
Isolator One Inch Deflection Rated Capacity Up To 434 Lb Up To 197 Kg Color Black
029-25334-002
Isolator One Inch Deflection Rated Capacity 435–765 Lb 198–347 Kg Color Dk Green
029-25334-003
Isolator One Inch Deflection Rated Capacity 766–1020 Lb 348–463 Kg Color Gray
029-25334-004
Isolator One Inch Deflection Rated Capacity 1021–1156 Lb 464–524 Kg Color White
029-25334-005
York Coolant, Approved Coolant
013-03344-000
Isolator One Inch Deflection Rated Capacity Up To 434 Lb Up To 197 Kg Color Black
029-25334-002
Isolator One Inch Deflection Rated Capacity 435–765 Lb 198–347 Kg Color Dk Green
029-25334-003
Isolator One Inch Deflection Rated Capacity 766–1020 Lb 348–463 Kg Color Gray
029-25334-004
Isolator One Inch Deflection Rated Capacity 1021–1156 Lb 464–524 Kg Color White
029-25334-005
York Coolant, Approved Coolant
013-03344-000
Isolator One Inch Deflection Rated Capacity Up To 434 Lb Up To 197 Kg Color Black
029-25334-002
Isolator One Inch Deflection Rated Capacity 435–765 Lb 198–347 Kg Color Dk Green
029-25334-003
Isolator One Inch Deflection Rated Capacity 766–1020 Lb 348–463 Kg Color Gray
029-25334-004
Isolator One Inch Deflection Rated Capacity 1021–1156 Lb 464–524 Kg Color White
029-25334-005
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX