MaintainX, an Autodesk company
EnterprisePricing
Wilkins

Wilkins Valve 375XLRP

Need answers fast?
Explore the manual using AI.

Wilkins Valve 375XLRP
Wilkins Valve 375XLRP

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Wilkins Valve 375XLRP

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Wilkins Valve 375XLRP

Wilkins Valve 375XLRP

Create an account to install this asset package.

Maintenance Plans for Wilkins Valve Model 375XLRP

Integrate maintenance plans directly into your work orders in MaintainX.

Differential Relief Valve Testing

Check mark

Close by-pass valve "C"

Check mark

Open by-pass valve "A"

Check mark

Open by-pass valve "B" very slowly until differential gauge needle starts to drop

Check mark

Observe the gauge reading at the moment the first discharge is noted from the relief valve

Check mark

Record the opening differential pressure of the relief valve

Run this procedureArrow right

Valve For Tightness Testing

Check mark

Close by-pass valve "A"

Check mark

Close test cock #4, and disconnect "VENT" hose from test cock #4

Check mark

Open by-pass valves "B" and "C" bleeding to atmosphere, then close by-pass valve "B" restoring the system to normal static condition

Check mark

Observe the pressure differential gauge and note this as the #1 check valve PSID

Check mark

Is the static pressure drop across #1 check valve greater than the relief valve opening point and at least 5.0 psid?

Run this procedureArrow right

Valve Maintenance

Check mark

Cleaning and Inspection

Check mark

Clean all parts thoroughly with water after disassembly

Check mark

Inspect for damage

Check mark

Reassembly and Testing

Check mark

Reassemble the unit

Check mark

Test unit for proper operation

Run this procedureArrow right

Check Valve Maintenance

Check mark

Close inlet and outlet shut-off valves

Check mark

Open No. 2, No. 3 and No. 4 test cocks to release pressure from valve

Check mark

Unscrew 4 screws holding body down and lift valve body upward

Check mark

Twist and remove sleeve from body

Check mark

Push in outlet end of body to slide out both checks from the body inlet

Check mark

Twist spring retainers counter-clockwise to remove from seat and access poppets

Check mark

Inspection and Cleaning

Check mark

Inspect the rubber seal ring for cuts or embedded debris

Check mark

Remove screw and seal ring retainer to remove seal ring

Run this procedureArrow right

Relief Valve Maintenance

Check mark

Disassembly and Inspection

Check mark

Remove bolts and relief valve module

Check mark

Ensure small and large o-rings are not lost

Check mark

Inspect diaphragm and replace parts if necessary

Check mark

Ensure stem assembly is handled carefully due to internal spring load

Check mark

Reassembly

Check mark

Reassemble module and cover

Check mark

Inspect and replace o-ring between module and check body if necessary

Check mark

Apply grease to the o-ring and place on step on check body

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Wilkins

Explore Other Assets