MaintainX, an Autodesk company
EnterprisePricing
Wilkins

Wilkins Reduced Pressure Principle 375XL 2”

Need answers fast?
Explore the manual using AI.

Wilkins Reduced Pressure Principle 375XL 2”
Wilkins Reduced Pressure Principle 375XL 2”

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Wilkins Reduced Pressure Principle 375XL 2”

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Wilkins Reduced Pressure Principle 375XL 2”

Wilkins Reduced Pressure Principle 375XL 2”

Create an account to install this asset package.

Maintenance Plans for Wilkins Reduced Pressure Principle Model 375XL 2”

Integrate maintenance plans directly into your work orders in MaintainX.

Relief Valve Service

Check mark

Disassembly

Check mark

Remove three bolts holding relief valve module to body

Check mark

Pull down and remove relief module to expose seat and seal ring

Check mark

Ensure o-rings are not lost

Check mark

Inspection and Replacement

Check mark

Remove the four screws holding the two module halves together

Check mark

Ensure o-rings are not lost

Check mark

Remove stem assembly and inspect diaphragm and plunger o-ring for damage

Check mark

Replace any damaged parts and apply grease to plunger o-ring

Run this procedureArrow right

Check Valve Service

Check mark

Close inlet and outlet shut-off valves

Check mark

Open No. 2, No. 3 and No. 4 test cocks to release pressure from valve

Check mark

Unscrew 4 screws holding body down and lift valve body upward

Check mark

Twist and remove sleeve from body

Check mark

Push in outlet end of body to slide out both checks from the body inlet

Check mark

Twist spring retainers counter-clockwise to remove from seat and access poppets

Check mark

Inspection and Cleaning

Check mark

Inspect the rubber seal ring for cuts or embedded debris

Check mark

Remove seal ring, invert if possible, and note if replacement is needed

Run this procedureArrow right

1 Yearly Reduced Pressure Principle Testing

Check mark

Equipment Setup

Check mark

Ensure availability of differential pressure gauge test kit

Check mark

Attach the "HIGH" hose to test cock #2 and the "LOW" hose to test cock #3

Check mark

Test No. 1 - #2 Check Valve Tightness

Check mark

Close #2 shut-off valve

Check mark

Open test cocks #2 and #3

Check mark

Open by-pass valves "C" and "A" and bleed to atmosphere until all air is expelled

Check mark

Close by-pass valve "A". Open by-pass valve "B" and bleed to atmosphere until all air is expelled. Close by-pass valves "B" and "C"

Check mark

Attach the "VENT" hose to test cock #4

Run this procedureArrow right

Parts for Wilkins Reduced Pressure Principle 375XL 2”

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Rubber Parts

RK114-375R

Complete Internals

RK114-375

Vessel

RK114-375V

Rubber Parts

RK114-375R

Complete Internals

RK114-375

Vessel

RK114-375V

Rubber Parts

RK114-375R

Complete Internals

RK114-375

Vessel

RK114-375V

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Wilkins

Explore Other Assets