

The WEG UR11 is a robust industrial motor designed for high efficiency and reliability. Manufactured by WEG, this model is suitable for various applications, ensuring optimal performance and longevity in demanding environments. Regular maintenance is essential to maximize its operational lifespan.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

WEG WEG WEG - UR11 UR11 UR11
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Monthly Inspection
Inspect:
- terminals and connectors for loose screws and connectors. Tighten if necessary.
- fans / cooling system for dirty fans, abnormal acoustic noise, blocked fan, abnormal vibration, dust in the cabinet air filter. Clean or replace if necessary.
- printed circuit boards for odor, accumulation of dust, oil, humidity, etc. Clean or replace if necessary.
- power module / power connections for loose connection screws, accumulation of dust, oil, humidity, etc. Tighten and clean if necessary.
- heatsink for dust accumulation and dirt. Clean if necessary.
When it becomes necessary to clean the rectifier, follow the instructions below.
Ventilation system:
- Cut off the rectifier supply and wait 10 minutes.
Hourly Replacement
Besides the periodic cleaning of the heatsink fins, it is recommended to exchange the fans after 50.000 hours operation. Figure 5.1 on page 5-4 shows the UR11 fans exchanging procedure.;
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













