MaintainX Asset Hub logo
EnterprisePricing
Trenton Refrigeration Products

Trenton Refrigeration Products Condensing Unit TEHA008M8

Need answers fast?
Explore the manual using AI.

Trenton Refrigeration Products Condensing Unit TEHA008M8
Trenton Refrigeration Products Condensing Unit TEHA008M8

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Trenton Refrigeration Products Condensing Unit TEHA008M8

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Trenton Refrigeration Products Condensing Unit TEHA008M8

Trenton Refrigeration Products Condensing Unit TEHA008M8

Create an account to install this asset package.

Maintenance Plans for Trenton Refrigeration Products Condensing Unit Model TEHA008M8

Integrate maintenance plans directly into your work orders in MaintainX.

6 Monthly Condensing Unit Check

Check mark

Pre-Inspection Safety

Check mark

Disconnect and lock off the main power supply

Check mark

Electrical System Inspection

Check mark

Check electrical components and tighten any loose connections

Check mark

Check all wiring and electrical insulators

Check mark

Check contactors for proper operation and contact point wear

Check mark

Fan and Motor Inspection

Check mark

Are fan motors operational?

Check mark

Ensure fan blades are tight

Run this procedureArrow right

Condensing Unit Leak Testing

Check mark

Initial Leak Testing

Check mark

Pressurize the system to a maximum of 150 psig (1136 kPa) with dry nitrogen

Check mark

Is the system free of major leaks?

Check mark

Detailed Leak Testing for A1 Refrigerants

Check mark

Discharge the initial dry nitrogen charge and add refrigerant to raise the system pressure up to 10 psig (170 kPa)

Check mark

Add dry nitrogen to increase the system pressure to a maximum of 150 psig (1136 kPa)

Check mark

Use an electronic leak detector to check for leaks

Check mark

Hold the pressure for a minimum of 12 hours

Check mark

Recheck the system after 12 hours. Is the system leak free?

Run this procedureArrow right

2 Weekly Condensing Unit System Check

Check mark

Compressor Pressure Check

Check mark

Enter the compressor discharge pressure

Check mark

Enter the compressor suction pressure

Check mark

Are the pressures within the allowable design limits?

Check mark

Refrigerant System Check

Check mark

Check the liquid line sight glass and expansion valve operation

Check mark

Is there an indication that the system is low on refrigerant?

Check mark

Describe any leaks found in the system

Check mark

Oil Level Check

Run this procedureArrow right

Evaporator Superheat Check

Check mark

Suction Pressure Measurement

Check mark

Select the method to measure suction pressure

Check mark

Record the suction pressure at the bulb location

Check mark

Temperature Measurement

Check mark

Measure the temperature of the suction line at the thermostatic expansion valve bulb location

Check mark

Saturated Temperature Conversion

Check mark

Convert the suction pressure to saturated evaporator temperature using a Pressure-Temperature chart

Check mark

Superheat Calculation

Check mark

Subtract the saturated temperature from the actual suction line temperature to find the superheat

Run this procedureArrow right

Initial 1 Day Condensing Unit Compressor Check

Check mark

Pre-Start Checks

Check mark

Ensure a qualified refrigeration mechanic is present

Check mark

Verify all installations are complete

Check mark

Initial Start-Up Monitoring

Check mark

Monitor compressor performance during the first operating cycle

Check mark

Check performance of all moving components during the first operating cycle

Check mark

Periodic Checks During First Day

Check mark

Is the compressor operating within expected parameters?

Check mark

Are all moving components functioning correctly?

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Trenton Refrigeration Products

Explore Other Assets