Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Trane CenTraVac™ Water-Cooled Chiller CVHF - 190-320 - 231 - 032L / 032L
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Control Circuits Inspection
Shut down the chiller once each year to check the items of Control Circuits
Verify control parameters
Test appropriate sensors for accuracy
Ensure sensors are properly seated in wells with thermopaste installed
Check evaporator leaving water temperature low temperature cutout setpoint
Condenser high pressure switch check-out
Check adjustment and operation of the inlet guide vane actuator
Sign off on the control circuits inspection
6 Monthly Chiller Maintenance
Operate the tang operators manually and check for any abnormalities
Drain contents of the rupture disk and purge discharge vent-line drip-leg into an evacuated waste container
Is the purge operated excessively?
If yes, repeat the second step more often.
Apply oil to any exposed metal parts to prevent rust
Sign off on the chiller maintenance
2 Monthly Sacrificial Anodes Replacement
Warning: Equipment Damage! Failure to follow instructions could result in equipment damage
Do NOT use Teflon-based tape or paste on anode; a small amount of liquid sealant (Loctite® 242 or equivalent) may be applied to prevent leakage when installing an anode, but do not apply so much sealant that it prevents the necessary electrical connection between the anode and the waterbox
As needed after draining the waterbox, use a 2-1/2 in. (63.5 mm) wrench to remove/install Trane-supplied waterbox anodes
Inspection of anodes for wear within the first several months of the anodes being placed into service
If the observed loss of anode material is small, then the interval between subsequent inspections can be lengthened
Replace the anode and/ or shorten the inspection interval if the anode has lost 50 percent or more of its original mass
If anode depletion occurs very quickly, consult a water treatment specialist to determine if the anode material selected is correct for the application
Sign off on the anode replacement
1 Yearly Chiller Maintenance
Contact a qualified service organization to determine when to conduct a complete examination of the unit to discern the condition of the compressor and internal components
Check for chronic air leaks
Check for evaporator water tube leaks
Check for condenser water tube leaks
Sign off on the yearly chiller maintenance
1 Yearly Evaporator Inspection
- Shut down the chiller once each year to check the items of Evaporator
1. Inspect for fouling and scaling in tubes
2. Check operation of evaporator water flow sensing device
3. Factory recommendation to eddy current test tubes every three years;
Access the parts list for your equipment in MaintainX.
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
Safety Hoist Ring 3/4-10, CTV Unit
RNG01884
Safety Hoist Ring 1/2-13, CTV Unit
RNG01885
Evap Lifting Fixture, CTV Unit
BAR00400
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.