

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Rinnai Water Heater RUR199i
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Yearly Pressure Relief Valve Testing
Safety Precautions
Ensure discharge has a safe place to flow
Verify no contact with body or property
Operate the pressure relief valve manually
Was the discharge area clear and safe?
Describe any issues encountered during the test
Testing performed by a licensed professional
Air Filter Cleaning
Power OFF the water heater
Push the 'On/Off' button located on the right-hand side of the controller
Verify the display is blank
Remove the front panel
Remove four screws securing the front panel
Remove the front panel and locate the filter at the upper right-hand corner of the water heater
Remove the air filter by pulling out the 'FILTER Pull to Clean' tab
Clean the Air Filter
Scrub the filter area of the air filter door with mild dish soap and a soft bristle brush
Freeze Protection Check
Initial Inspection
Check the water heater for any visible signs of damage
Ensure the water lines are insulated
Manual Drainage
Refer to the 'Freeze Protection' section in the manual
Manually drain the water heater if necessary
Automatic Drainage System
Verify the installation of drain down solenoid valves
Check the functionality of the drain down solenoid valves
Flame Inspection
Flame Operation Verification
Check that the burner flames evenly over the entire surface
Verify the flame burns with a clear, blue, stable flame
Reference Materials
Review the parts breakdown of the burner for the location of the view ports
Consult the flame pattern images on page 66
Air Filter Inspection
Visual Inspection
Check for lint build-up on the air filter
Check for dust accumulation on the air filter
Inspect the air filter for any visible damage
Cleaning Procedure
Remove the air filter from the assembly
Clean the air filter using appropriate cleaning tools
Reinstall the air filter into the assembly
Post-Inspection Actions
Access the parts list for your equipment in MaintainX.
Vent Screens, 2 In.
196050
Vent Screens, 3 In.
196051
CVent Roof Termination, 6 in.
790096
CVent Roof Termination, 4in.
790095
CVent Roof Termination, 3 in.
790125
Vent Screens, 2 In.
196050
Vent Screens, 3 In.
196051
CVent Roof Termination, 6 in.
790096
CVent Roof Termination, 4in.
790095
CVent Roof Termination, 3 in.
790125
Vent Screens, 2 In.
196050
Vent Screens, 3 In.
196051
CVent Roof Termination, 6 in.
790096
CVent Roof Termination, 4in.
790095
CVent Roof Termination, 3 in.
790125
MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













