MaintainX, an Autodesk company
EnterprisePricing
Rinnai

Rinnai Water Heater RUR199i

Need answers fast?
Explore the manual using AI.

Rinnai Water Heater RUR199i
Rinnai Water Heater RUR199i

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Rinnai Water Heater RUR199i

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Rinnai Water Heater RUR199i

Rinnai Water Heater RUR199i

Create an account to install this asset package.

Maintenance Plans for Rinnai Water Heater Model RUR199i

Integrate maintenance plans directly into your work orders in MaintainX.

1 Yearly Pressure Relief Valve Testing

Check mark

Safety Precautions

Check mark

Ensure discharge has a safe place to flow

Check mark

Verify no contact with body or property

Check mark

Operate the pressure relief valve manually

Check mark

Was the discharge area clear and safe?

Check mark

Describe any issues encountered during the test

Check mark

Testing performed by a licensed professional

Run this procedureArrow right

Air Filter Cleaning

Check mark

Power OFF the water heater

Check mark

Push the 'On/Off' button located on the right-hand side of the controller

Check mark

Verify the display is blank

Check mark

Remove the front panel

Check mark

Remove four screws securing the front panel

Check mark

Remove the front panel and locate the filter at the upper right-hand corner of the water heater

Check mark

Remove the air filter by pulling out the 'FILTER Pull to Clean' tab

Check mark

Clean the Air Filter

Check mark

Scrub the filter area of the air filter door with mild dish soap and a soft bristle brush

Run this procedureArrow right

Freeze Protection Check

Check mark

Initial Inspection

Check mark

Check the water heater for any visible signs of damage

Check mark

Ensure the water lines are insulated

Check mark

Manual Drainage

Check mark

Refer to the 'Freeze Protection' section in the manual

Check mark

Manually drain the water heater if necessary

Check mark

Automatic Drainage System

Check mark

Verify the installation of drain down solenoid valves

Check mark

Check the functionality of the drain down solenoid valves

Run this procedureArrow right

Flame Inspection

Check mark

Flame Operation Verification

Check mark

Check that the burner flames evenly over the entire surface

Check mark

Verify the flame burns with a clear, blue, stable flame

Check mark

Reference Materials

Check mark

Review the parts breakdown of the burner for the location of the view ports

Check mark

Consult the flame pattern images on page 66

Run this procedureArrow right

Air Filter Inspection

Check mark

Visual Inspection

Check mark

Check for lint build-up on the air filter

Check mark

Check for dust accumulation on the air filter

Check mark

Inspect the air filter for any visible damage

Check mark

Cleaning Procedure

Check mark

Remove the air filter from the assembly

Check mark

Clean the air filter using appropriate cleaning tools

Check mark

Reinstall the air filter into the assembly

Check mark

Post-Inspection Actions

Run this procedureArrow right

Parts for Rinnai Water Heater RUR199i

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Vent Screens, 2 In.

196050

Vent Screens, 3 In.

196051

CVent Roof Termination, 6 in.

790096

CVent Roof Termination, 4in.

790095

CVent Roof Termination, 3 in.

790125

Vent Screens, 2 In.

196050

Vent Screens, 3 In.

196051

CVent Roof Termination, 6 in.

790096

CVent Roof Termination, 4in.

790095

CVent Roof Termination, 3 in.

790125

Vent Screens, 2 In.

196050

Vent Screens, 3 In.

196051

CVent Roof Termination, 6 in.

790096

CVent Roof Termination, 4in.

790095

CVent Roof Termination, 3 in.

790125

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Rinnai

Explore Other Assets