MaintainX Asset Hub logo
EnterprisePricing
Pitco

Pitco Gas Fryer SSH60W

Need answers fast?
Explore the manual using AI.

Pitco Gas Fryer SSH60W
Pitco Gas Fryer SSH60W

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Pitco Gas Fryer SSH60W

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Pitco Gas Fryer SSH60W

Pitco Gas Fryer SSH60W

Create an account to install this asset package.

Maintenance Plans for Pitco Gas Fryer Model SSH60W

Integrate maintenance plans directly into your work orders in MaintainX.

1 Daily Flush Hose Maintenance

Check mark

Preparation

Check mark

Turn the appliance OFF

Check mark

Draining the Cooker Tank

Check mark

Pull the blue drain handle down to drain oil/shortening into the filter pan

Check mark

Connecting the Flush Hose

Check mark

Connect the filter flush hose to the quick connecting fitting

Check mark

Point the filter hose nozzle outlet into the cooker tank

Check mark

Flushing the Cooker Tank

Check mark

Pull the yellow handle to turn the pump on

Run this procedureArrow right

1 Daily Gas Fryer Inspection

Check mark

Appliance Inspection

Check mark

Check that the high temperature limit and temperature probe are in the correct position and secured in place

Check mark

Check that wires and cords are not frayed or loose in and out of the cabinet

Check mark

Check around the appliance for loose parts or accessories that need to be secured or other foreign items (e.g., Aerosol cans) that should be removed from the area

Check mark

Check for oil/shortening leaks around the in and out of the cabinet and around the appliance

Check mark

Safety Precautions

Check mark

Wear apron, heat resistant gloves for skin protection and goggles for eye protection

Check mark

Read the operation section of the manual prior to filling or operating the appliance

Check mark

Do not leave the appliance unattended during cleaning

Run this procedureArrow right

1 Yearly Temperature Control System Inspection

Check mark

Electrical Connections and Harnesses

Check mark

Check electrical connections and harnesses for integrity

Check mark

Temperature Probes and Limits

Check mark

Check temperature probes for carbon build up and plating

Check mark

Clean temperature probes if carbon build up or plating is found

Check mark

Mounting and Fasteners

Check mark

Check proper mounting of probes and sensors

Check mark

Ensure all fasteners are secure

Check mark

Thermistor Probe Resistances

Run this procedureArrow right

1 Daily Filter Media Replacement

Check mark

Safety Precautions

Check mark

Disconnect the power supply before cleaning and servicing the appliance.

Check mark

Ensure contents of the crumb catch and/or filter pan are emptied into a fireproof container at the end of the frying operation.

Check mark

Filter Media Replacement

Check mark

Detach the pickup tube from the filter pickup assembly by unscrewing it counterclockwise at the knurled fitting.

Check mark

Slide off the filter paper clip and remove used filter paper from filter screen.

Check mark

Replace with new filter paper, ensuring the hole in the paper is on the top so that the threaded fitting in filter screen protrudes through it.

Check mark

Fold filter paper to the underside of the filter screen and replace filter paper clip.

Check mark

Re-attach filter pickup tube to the filter screen by screwing it clockwise into the threaded fitting.

Run this procedureArrow right

1 Weekly Gas Fryer Maintenance

Check mark

Preparation

Check mark

Turn the fryer off

Check mark

Allow the oil/shortening to cool before pulling the fryer away from the hood

Check mark

Disconnect the power cord(s), gas hose, and retention lanyard

Check mark

Fryer Positioning

Check mark

Wear protective gear

Check mark

Pull the fryer away from the hood

Check mark

Inspection

Check mark

Check that the following are not dripping oil/shortening into the flue

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Pitco

Explore Other Assets