MaintainX Logo
EnterprisePricing
Panasonic

Panasonic Static Remover Ultracompact Fan Ionizer ER-Q

Need answers fast?
Explore the manual using AI.

Panasonic Static Remover Ultracompact Fan Ionizer ER-Q
Panasonic Static Remover Ultracompact Fan Ionizer ER-Q

The Panasonic Static Remover Ultracompact Fan Ionizer ER-Q is a high-performance ionizing fan designed to eliminate static electricity in various industrial applications. Its compact design and efficient ionization technology make it ideal for maintaining optimal working conditions in sensitive environments.

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Panasonic Static Remover Ultracompact Fan Ionizer ER-Q

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Panasonic Static Remover Ultracompact Fan Ionizer ER-Q

Panasonic Static Remover Ultracompact Fan Ionizer ER-Q

Create an account to install this asset package.

Maintenance Plans for Panasonic Static Remover Ultracompact Fan Ionizer Model ER-Q

Integrate maintenance plans directly into your work orders in MaintainX.

Maintenance 1W/10000H

Check mark

1 Follow the procedure given below to remove the discharge needle unit from the main unit.

Check mark

2 Use a cotton swab or similar moistened in alcohol to clean the discharge needles and the areas around them.

Check mark

If the needles are particularly dirty, use a brush (such as a toothbrush) moistened with alcohol to rub them clean, and then use a cotton swab to wipe them.

Check mark

A commercially-available ultrasonic cleaner can also be used for cleaning. (Immerse the discharge needle unit into the cleaning tank to clean them.)

Check mark

3 Insert the tabs of the discharge needle unit into the two slots in the main unit, slide the discharge needle unit sideways to install it to the main unit until a click is heard.;

Run this procedureArrow right

Maintenance 1M

Check mark

Install and use a filter depending on the operating environment.

Check mark

1 Turn the filter cover in the direction shown in the illustration to align the * marks.

Check mark

2 Remove the filter cover and the filter from the ER-Q main unit.

Check mark

3 Remove the filter from the filter cover, and remove any dust and dirt adhering to the filter. If the filter is extremely dirty, wash it in water. If washing the filter in water, let it dry thoroughly before using it again.

Check mark

4 Install the filter and the filter cover to the ER-Q main unit.

Check mark

* If the filter is used while it is still wet, accidents or problems with operation may occur.

Check mark

* If the filter cannot be cleaned, replace it.

Check mark

* Be careful not to let any foreign objects get inside the main unit when removing and installing the filter.;

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Panasonic

Explore Other Assets