

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Ohaus Explorer Balances EX12001
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Load Cell Replacement
Disassembly
Open the balance and verify no mechanical interference, pinched wire, or bad solder connection
Turn the base on its side and remove the 3 screws holding the Load Cell to the Base
Hold the load cell with one hand when unscrewing the last screw
Turn the base back on its feet ensuring the load cell does not fall out
Remove all cables connecting the load cell to the PCB and lift the load cell out from the housing
Re-Assembly
Reverse the disassembly procedure to assemble the balance
Ensure no foreign material between the Base mounting surfaces and the Load cell
Repeatability Test
Set Up
Enter the service menu and adjust settings
Record Stability Setting
Record Filter Level Setting
Record Auto Zero Tracking Setting
Enter the User Menu and adjust display units
Record Displayed Units
Record Mass Used
Test Procedure for Non-Approved Models
Operational Test
Power Connection
Connect a functioning Power Adapter to the balance
Plug the Power Cord into a suitable power source
Startup Verification
Did the balance start up sequence occur properly?
Note any error codes
Feet Replacement
Preparation
Ensure all necessary tools and parts are available
Review the sketch for assembly order and plate placement
Bearing Assembly
Check the components of the bearing assembly
Ensure the curved surface of the disks face the ball bearings
Plate Installation
Is the load bearing plate placed correctly with the curve facing inward and towards the front?
Final Assembly
Off-Center Load Test
Preparation
Set AZT (Auto Zero Tracking) to off
Place the test weight in the center of the Weighing Pan
Tare the balance
Weight Movement and Recording
Record the reading at location A
Record the reading at location B
Record the reading at location C
Record the reading at location D
Access the parts list for your equipment in MaintainX.
Function Label EX
83033626
Top Housing Assembly, Terminal EX
30019590
Display, LCD EX
83033622
PCB, Main, Terminal EX
83033620
PCB Interconnect, Terminal EX
83033621
Function Label EX
83033626
Top Housing Assembly, Terminal EX
30019590
Display, LCD EX
83033622
PCB, Main, Terminal EX
83033620
PCB Interconnect, Terminal EX
83033621
Function Label EX
83033626
Top Housing Assembly, Terminal EX
30019590
Display, LCD EX
83033622
PCB, Main, Terminal EX
83033620
PCB Interconnect, Terminal EX
83033621
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













