Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Mitsubishi Air Conditioner EACV-M1500YCL-N
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Compressor Replacement
- Recover the refrigerant through the check joint (low-pressure (LP) side) on the left side of the unit next to the plate heat exchanger side.
* Each refrigerant circuit is independent.
Only collect the refrigerant from the system whose LEV needs to be replaced.
■ Refrigerant (R32)
EAHV type: 11.5 kg per system
EACV type: 4.7 kg per system
- When replacing compressors 1B, 2A, and 2B, remove the pillars by unscrewing the eight M5 screws.
Pillar: Mounted with M5 screws (3.0±0.3 Nm)
* When the pillar is removed, the frame will sag down by its own weight.
Heat Exchanger Replacement
Remove the service side panels from the opposite side of the service side
Completely drain the water from the water circuit
Collect the refrigerant through the check joint (low-pressure (LP) side) on the left side of the unit next to the plate heat exchanger side
Select the type of refrigerant
Remove the pillar when replacing the heat exchanger in the 1-system by unscrewing the four M5 screws
Disconnect the water pipe from the heat exchanger to be replaced
Remove the upper joint plate from the water pipe side
Remove the lower support plate on the LEV side from the heat exchanger to be replaced
Remove the joint plate at the upper portion of the heat exchanger on the LEV side
LEV Replacement
Warning: This procedure requires trained personnel with PPE!
Recover the refrigerant through the check joint (low-pressure (LP) side) on the left side of the unit next to the plate heat exchanger.
Select the type of refrigerant circuit
Remove the pillars by unscrewing the four M5 screws.
Cut the tie band as required, and remove the LEV coil.
Select the type of LEV
Remove the U-pipe located in front of the LEV by removing the braze from the two areas shown in the figure.
Braze the pipe that was removed in step 5 to the new LEV.
Pressurize the unit from the high pressure side.
Fan Replacement
Warning: Ensure the power is off before starting the procedure
Center panel removed by unscrewing the ten M5 screws
Fan motor relay connectors disconnected
Bell mouth and mounting plate removed by unscrewing the four M5 screws
Tie band cut and fan motor wire bundled and placed near the fan motor
Propeller removed by unscrewing the M12 box nut
Fan motor removed by unscrewing the four screws
Procedure reversed to complete the replacement
Sign off on the fan replacement
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX