Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more
Mikasa Portable Vibrator UM-F32
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Portable Vibrator Maintenance
WARNING! Before inspection and maintenance work, always turn off the switch and unplug from the power outlet.
Do maintenance work carefully.
Check the cord regularly, and if damage is detected, contact the sales store for repair.
If repair is done by someone without proper repair knowledge or skill, the machine will not function properly, and even accident and injury might occur.
When using a connection (extension) cord, check it regularly and if damage is detected, replace it with a new one.
Keep the holding part dry and clean all the time. Keep the holding part free of oil and grease.
DANGER! Always turn off the switch and unplug from the power outlet before starting check or maintenance work.
Check of bolts used to fix parts.
Remove the mortar that has adhered at the air vent (cap).
100 Hourly Shaft & Bearing Greasing
Warning: This procedure requires trained personnel with PPE!
Enter the machine's hour meter reading
Is the machine's hour meter reading around 100 hours?
If the machine's hour meter reading is not around 100 hours, stop the procedure
Cleanly wiped off the grease on the flexible shaft and bearing?
Applied new grease evenly on the entire surface of the shaft?
Pulled out the rotor from the vibrating case and washed well the inside of the case and the bearing of the rotor?
When a new bearing is used, filled it sufficiently with grease?
Did not put grease inside the case?
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX