

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Magnetrol International Level Switch A15-1H3E-DKQ
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Switch Housing Wiring
Preparation
Ensure enclosing tube is tightened and middle set screw is locked to the enclosing tube.
Is the control equipped with a pneumatic switch mechanism?
Conduit Entry Positioning
Loosen set screw(s) at base of switch housing.
Rotate switch housing to desired conduit entry position.
Tighten set screws at base of housing.
Switch Mechanism Repositioning
Unscrew and remove switch housing cover.
Unit Inspection
Unpacking and Initial Inspection
Unpack the instrument carefully
Inspect all units for damage
Report any concealed damage to carrier within 24 hours
Verification of Contents
Check the contents of the packing slip
Verify against the purchase order
Serial Number Recording
Record the serial number for future reference
Displacer Level Switch Mounting
Safety Precautions
Ensure the instrument is used in Installation Category II, Pollution Degree 2.
Handle displacer spring and stem carefully to avoid damage.
Displacer Adjustment and Installation
Adjust displacers on the cable for desired switch actuating levels.
Screw displacer cable fitting to the threaded connection link.
Tank and Vessel Preparation
Ensure no obstacles in the tank interfere with displacer operation.
Is a guide pipe or tube necessary due to liquid turbulence?
1 Monthly Switch Mechanism Inspection
Inspect Dry Contact Switches
Inspect for excessive wear on actuating lever or misalignment of adjustment screw
Refer to switch mechanism bulletin if adjustment or replacement is necessary
Check for Defective or Maladjusted Switch Mechanisms
Ensure control is not operated with defective or maladjusted switch mechanisms
Inspect Electrical Wiring
Check for brittle insulation on electrical wiring
Replace wiring at first sign of brittle insulation
Check Terminal Connections
Control Housing Cleaning
Initial Inspection
Ensure the switch housing cover is in place
Inspect the housing cover for any damage or signs of wear
Cleaning Process
Clean the switch housing cover to remove dust and dirt
Check for any moisture or corrosive gas infiltration
Post-Cleaning Actions
Is the housing cover free from damage after cleaning?
Is a positive seal maintained to prevent moisture infiltration?
Access the parts list for your equipment in MaintainX.
Handle Low Pressure
004-4011-001
Handle Medium Pressure
004-0490-001
O-Ring Medium Pressure
012-2205-001
Spring Low Pressure / Medium Pressure
013-2502-001
Cable Assembly Low Pressure / Medium Pressure
089-5807-001
Handle Low Pressure
004-4011-001
Handle Medium Pressure
004-0490-001
O-Ring Medium Pressure
012-2205-001
Spring Low Pressure / Medium Pressure
013-2502-001
Cable Assembly Low Pressure / Medium Pressure
089-5807-001
Handle Low Pressure
004-4011-001
Handle Medium Pressure
004-0490-001
O-Ring Medium Pressure
012-2205-001
Spring Low Pressure / Medium Pressure
013-2502-001
Cable Assembly Low Pressure / Medium Pressure
089-5807-001
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













