MaintainX Asset Hub logo
EnterprisePricing
Magnetrol International

Magnetrol International Level Switch A15-1H3Q-BNQ

Need answers fast?
Explore the manual using AI.

Magnetrol International Level Switch A15-1H3Q-BNQ
Magnetrol International Level Switch A15-1H3Q-BNQ

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Magnetrol International Level Switch A15-1H3Q-BNQ

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Magnetrol International Level Switch A15-1H3Q-BNQ

Magnetrol International Level Switch A15-1H3Q-BNQ

Create an account to install this asset package.

Maintenance Plans for Magnetrol International Level Switch Model A15-1H3Q-BNQ

Integrate maintenance plans directly into your work orders in MaintainX.

Displacer Level Switch Mounting

Check mark

Safety Precautions

Check mark

Ensure the instrument is used in Installation Category II, Pollution Degree 2.

Check mark

Handle displacer spring and stem with care to avoid damage.

Check mark

Displacer Adjustment and Installation

Check mark

Adjust displacers on the cable for desired switch actuating levels.

Check mark

Screw displacer cable fitting to the threaded connection link.

Check mark

Ensure no obstacles in the tank interfere with displacer operation.

Check mark

Determine if a guide pipe or tube is necessary due to liquid turbulence.

Check mark

Pipe or Tube Installation Check

Run this procedureArrow right

Control Housing Cleaning

Check mark

Pre-Cleaning Inspection

Check mark

Inspect the switch housing cover for damage or misplacement

Check mark

Check for any damaged or missing seals

Check mark

Cleaning Process

Check mark

Clean the switch housing cover

Check mark

Ensure the housing cover is securely in place after cleaning

Check mark

Post-Cleaning Actions

Check mark

Is the housing cover securely in place after cleaning?

Check mark

Are all seals intact and undamaged after cleaning?

Run this procedureArrow right

Switch Housing Wiring

Check mark

Preparation

Check mark

Ensure the enclosing tube is tightened and the middle set screw is locked to the enclosing tube.

Check mark

Is the control equipped with a pneumatic switch mechanism?

Check mark

Conduit Entry Positioning

Check mark

Loosen set screw(s) at base of switch housing.

Check mark

Rotate switch housing to desired conduit entry position.

Check mark

Tighten set screws at base of housing.

Check mark

Switch Mechanism Repositioning

Check mark

Unscrew and remove switch housing cover.

Run this procedureArrow right

Unit Inspection

Check mark

Unpacking and Initial Inspection

Check mark

Unpack the instrument carefully

Check mark

Inspect all units for damage

Check mark

Report any concealed damage to carrier within 24 hours

Check mark

Verification of Contents

Check mark

Check the contents of the packing slip and purchase order

Check mark

Record the serial number for future reference when ordering parts

Check mark

Handling Precautions

Check mark

Ensure no force is placed on fragile components

Run this procedureArrow right

1 Monthly Switch Mechanism Inspection

Check mark

Inspect Switch Mechanisms

Check mark

Inspect dry contact switches for excessive wear on actuating lever or misalignment of adjustment screw.

Check mark

Describe any wear or misalignment found on switches.

Check mark

Check Electrical Wiring

Check mark

Inspect wiring for signs of brittle insulation.

Check mark

Describe any brittle insulation found.

Check mark

Check Terminal Connections

Check mark

Ensure all terminal screws are tight.

Check mark

Inspect Pneumatic Switches

Run this procedureArrow right

Parts for Magnetrol International Level Switch A15-1H3Q-BNQ

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Handle Low Pressure

004-4011-001

Handle Medium Pressure

004-0490-001

O-Ring Medium Pressure

012-2205-001

Spring Low Pressure / Medium Pressure

013-2502-001

Cable Assembly Low Pressure / Medium Pressure

089-5807-001

Handle Low Pressure

004-4011-001

Handle Medium Pressure

004-0490-001

O-Ring Medium Pressure

012-2205-001

Spring Low Pressure / Medium Pressure

013-2502-001

Cable Assembly Low Pressure / Medium Pressure

089-5807-001

Handle Low Pressure

004-4011-001

Handle Medium Pressure

004-0490-001

O-Ring Medium Pressure

012-2205-001

Spring Low Pressure / Medium Pressure

013-2502-001

Cable Assembly Low Pressure / Medium Pressure

089-5807-001

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Magnetrol International

Explore Other Assets