Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Magnetrol International Level Switch A15-1H3H-HM7
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Unit Inspection
Unpacking and Initial Inspection
Unpack the instrument carefully
Inspect all units for damage
Report any concealed damage to carrier within 24 hours
Verification of Contents
Check the contents of the packing slip and purchase order
Record the serial number for future reference when ordering parts
Handling Precautions
Ensure no force is placed on fragile components
Displacer Level Switch Mounting
Safety Precautions
Ensure the instrument is used in Installation Category II, Pollution Degree 2.
Handle displacer spring and stem with care to avoid damage.
Displacer Adjustment and Installation
Adjust displacers on the cable for desired switch actuating levels.
Screw displacer cable fitting to the threaded connection link on the control.
Tank and Vessel Preparation
Ensure no obstacles in the tank interfere with displacer operation.
Determine if a guide pipe or tube is necessary due to liquid turbulence.
Switch Housing Wiring
Preparation
Ensure the set screw is loosened before repositioning the conduit connection.
Is the control equipped with a pneumatic switch mechanism?
Conduit Entry Positioning
Loosen set screw(s) at base of switch housing.
Rotate switch housing to desired conduit entry position.
Tighten set screws at base of housing.
Switch Mechanism Repositioning
Unscrew and remove switch housing cover.
Control Housing Cleaning
Pre-Cleaning Inspection
Inspect the switch housing cover for damage or misplacement
Check for any damaged or missing seals
Cleaning Process
Ensure the switch housing cover is in place during cleaning
Clean the exterior of the control housing
Post-Cleaning Inspection
Verify the following components are in place and undamaged
Is the housing cover properly sealed after cleaning?
1 Monthly Switch Mechanism Inspection
Inspect Dry Contact Switches
Inspect actuating lever for excessive wear
Check for misalignment of adjustment screw at point of contact with lever
Check Electrical Wiring
Inspect insulation on electrical wiring for brittleness
Replace wiring with brittle insulation
Inspect Terminal Connections
Check all terminal connections for loose screws
Tighten any loose terminal screws
Access the parts list for your equipment in MaintainX.
Handle Low Pressure
004-4011-001
Handle Medium Pressure
004-0490-001
O-Ring Medium Pressure
012-2205-001
Spring Low Pressure / Medium Pressure
013-2502-001
Cable Assembly Low Pressure / Medium Pressure
089-5807-001
Handle Low Pressure
004-4011-001
Handle Medium Pressure
004-0490-001
O-Ring Medium Pressure
012-2205-001
Spring Low Pressure / Medium Pressure
013-2502-001
Cable Assembly Low Pressure / Medium Pressure
089-5807-001
Handle Low Pressure
004-4011-001
Handle Medium Pressure
004-0490-001
O-Ring Medium Pressure
012-2205-001
Spring Low Pressure / Medium Pressure
013-2502-001
Cable Assembly Low Pressure / Medium Pressure
089-5807-001
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX