MaintainX, an Autodesk company
EnterprisePricing
Ingersoll Rand

Ingersoll Rand Compressor RS75I

Need answers fast?
Explore the manual using AI.

Ingersoll Rand Compressor RS75I
Ingersoll Rand Compressor RS75I

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Ingersoll Rand Compressor RS75I

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Ingersoll Rand Compressor RS75I

Ingersoll Rand Compressor RS75I

Create an account to install this asset package.

Maintenance Plans for Ingersoll Rand Compressor Model RS75I

Integrate maintenance plans directly into your work orders in MaintainX.

Air Cooled Cooler Removal

Check mark

Stop the compressor

Check mark

Isolate the compressor from the system

Check mark

Press the emergency stop

Check mark

Ensure that the main power disconnect switch is locked off and tagged

Check mark

Drain the coolant from the coolant cooler

Check mark

Remove all hoses, pipes, and sensors from the coolers

Check mark

Remove the external sheet metal panels

Check mark

Remove cooler mounting connection at both sides of the cooler

Check mark

Remove cooler out from mounting connection

Run this procedureArrow right

4000 Hourly Compressor Maintenance

Check mark

Inspect for blockages and replace elements

Check mark

Inspect and Clean Cooling Systems

Check mark

Inspect / Clean Air-cooled cooling system

Check mark

Inspect / Clean Water-cooled cooling system

Check mark

Calibrate Pressure transducers

Check mark

Grease Drive motors (as required)

Run this procedureArrow right

Water Cooled Cooler Cleaning

Check mark

Inspection and Preparation

Check mark

Inspect water inlet line strainers

Check mark

Replace or clean strainers if required

Check mark

Chemical Cleaning

Check mark

Select a suitable de-scaling agent

Check mark

Remove mineral scale using the selected de-scaling agent

Check mark

Remove fouling with detergent in hot water

Check mark

Flushing and Final Steps

Check mark

Back flush the cooler with a flow rate at least 1.5 times the normal flow rate

Run this procedureArrow right

Motor Cowl Cleaning

Check mark

Ensure the compressor is electrically isolated for at least 15 minutes before commencing any maintenance work

Check mark

Remove the panels from the compressor

Check mark

Clean the motor cowl

Check mark

Remove dust from the surface of the motor cowl using a clean dry cloth

Check mark

Ensure all ventilation slots are free of obstructions

Check mark

Replace the panels

Run this procedureArrow right

Package Pre-Filter Cleaning

Check mark

Opening the Intake Panel

Check mark

Unlatch the two 1/4 turn latches

Check mark

Open the intake panel (panel is hinged)

Check mark

Removing the Old Filter

Check mark

Remove the nuts and flat washer

Check mark

Remove the filter grill

Check mark

Pull out the filter element

Check mark

Installing the New Filter

Check mark

Center the new element over the package intake opening

Run this procedureArrow right

Unlock
efficiency with MaintainX Assist

MaintainX Assist is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Ingersoll Rand

Explore Other Assets