

The Hobart AirForce 625 is a high-performance industrial air compressor designed for efficiency and reliability. This model is ideal for various applications, providing consistent air pressure and durability in demanding environments. Regular maintenance ensures optimal performance and longevity of the AirForce 625.
Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Hobart Hobart - AirForce 625 AirForce 625
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
3 Months Check
- Replace Unreadable Labels
- Service Air Filter/Regulator Assembly Filter
- Replace Cracked Parts
- Check Gas/Air Hose
- Tape Torn Outer Covering Or Replace Cable
- Check Torch Body;
6 Months Clean
Blow Out Or Vacuum Inside
Checking/Replacing Retaining Cup, Tip, And Electrode
Turn Off power source
1 Drag Shield
2 Retaining Cup
Remove retaining cup. Check retaining cup for cracks, and replace if necessary
3 Tip
4 Opening
Remove tip. Check tip, and replace if opening is deformed or 50% oversize
If inside of tip is not clean and bright, clean with steel wool
Be sure to remove any pieces of steel wool afterwards
Each Use Check
- Check Torch Tip, Electrode, And Shield Cup
- Check Gas/Air Pressure;
Weekly Shield Cup Shutdown System Check
Check Shield Cup Shutdown System
Access the parts list for your equipment in MaintainX.
BAFFLE, AIR WINDTUNNEL
208186
BASE
204324
BOX, LOUVER
175138
BRACKET
204329
BRACKET
204330
BAFFLE, AIR WINDTUNNEL
208186
BASE
204324
BOX, LOUVER
175138
BRACKET
204329
BRACKET
204330
BAFFLE, AIR WINDTUNNEL
208186
BASE
204324
BOX, LOUVER
175138
BRACKET
204329
BRACKET
204330
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













