

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Graco Plural Component Proportioner MD4334
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1 Monthly Meter Calibration
Warning: Wear eye protection to avoid splashing fluid in the eyes.
Calibrate the meter: The first time the system is operated, whenever new materials are used in the system, at least once per month as part of regular maintenance, whenever a flow meter is serviced or replaced.
Before calibrating meter A or B, prime the system with material. For a color/catalyst change system, make sure the color/catalyst valve is open.
Shut off all spray or dispense devices connected to the ProMix.
Close both fluid shutoff valves and sampling valves.
Place the beakers (minimum size - 250 cc) in holders. Put the sampling tubes into the beakers.
On the EasyKey, press the Setup key to access setup screens.
Select Recipe & Advanced Setup and press the Enter key to select.
Press the Right Arrow key to select the Calibration Screen. Press the Enter key to select either A Meter, B Meter, or Solvent. Press the Down Arrow key and select Start from the menu. Start only one at a time.
1 Daily Equipment Check
Check equipment for any worn or damaged parts
List any worn or damaged parts found
Check air purge valve tubing
Is there any visible solvent accumulation in the air purge valve supply tube?
If solvent is present, notify your supervisor immediately
Sign off on the daily equipment check
Access the parts list for your equipment in MaintainX.
Third Purge Valve Kit
15V354
Solvent Flow Switch Kit
15V536
Power Cable, 100 Ft (30.5 M)
15V213
Fiber Optic Cable, 100 Ft (30.5 M)
15G710
Injection Kit For Dynamic Dosing
15U955
Third Purge Valve Kit
15V354
Solvent Flow Switch Kit
15V536
Power Cable, 100 Ft (30.5 M)
15V213
Fiber Optic Cable, 100 Ft (30.5 M)
15G710
Injection Kit For Dynamic Dosing
15U955
Third Purge Valve Kit
15V354
Solvent Flow Switch Kit
15V536
Power Cable, 100 Ft (30.5 M)
15V213
Fiber Optic Cable, 100 Ft (30.5 M)
15G710
Injection Kit For Dynamic Dosing
15U955
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













