MaintainX Asset Hub logo
EnterprisePricing
Goulds Pumps

Goulds Pumps Pump 3355 4 x 5-10A-1800

Need answers fast?
Explore the manual using AI.

Goulds Pumps Pump 3355 4 x 5-10A-1800
Goulds Pumps Pump 3355 4 x 5-10A-1800

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Goulds Pumps Pump 3355 4 x 5-10A-1800

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Goulds Pumps Pump 3355 4 x 5-10A-1800

Goulds Pumps Pump 3355 4 x 5-10A-1800

Create an account to install this asset package.

Maintenance Plans for Goulds Pumps Pump Model 3355 4 x 5-10A-1800

Integrate maintenance plans directly into your work orders in MaintainX.

Pump Maintenance

Check mark

6.4 Disassembly

Check mark

Safety Precautions

Check mark

6.4.3 Drain the pump

Check mark

Allow all system and pump components to cool before handling

Check mark

If the pumped fluid is non-conductive, drain and flush the pump with a conductive fluid

Check mark

6.4.4 Prepare for disassembly

Check mark

Position the pump for disassembly

Check mark

6.4.6 Disassemble the discharge end ball bearing for the radial suction configuration

Check mark

Disassemble steps

Run this procedureArrow right

1 Yearly Pump Performance Inspection

Check mark

6.1 Maintenance schedule — Annual inspections

Check mark

Record the pump capacity

Check mark

Record the pump pressure

Check mark

Record the pump power

Check mark

Does the pump performance satisfy process requirements?

Check mark

Is the pumped fluid abrasive or corrosive, or is the environment potentially explosive?

Run this procedureArrow right

Coupling Alignment Check

Check mark

4.3.1 Alignment checks

Check mark

Perform alignment checks under these circumstances

Check mark

Perform alignment checks periodically following plant operating procedures

Check mark

Enter the Total Indicated Reading (T.I.R.) at operating temperature

Check mark

Enter the tolerance of the indicator

Check mark

4.3.3 Alignment measurement guidelines

Check mark

Rotate the pump coupling half and the driver coupling half together

Check mark

Ensure indicator rods have contact with the same points on the driver coupling half

Check mark

Move or shim only the driver to make adjustments

Run this procedureArrow right

3 Monthly Pump Alignment Inspection

Check mark

6.1 Maintenance schedule — Three-month inspections

Check mark

Check that the foundation and the hold-down bolts are tight

Check mark

Check the shaft alignment, and realign as required

Check mark

Is the pumped fluid abrasive or corrosive?

Check mark

Is the environment classified as potentially explosive?

Check mark

If yes to any of the above, describe how the inspection intervals should be adjusted

Run this procedureArrow right

After Maintenance Bearing Lubrication

Check mark

6.2.5 Lubricate the bearings after a shutdown period

Check mark

Flush out the bearings and bearing frame with a light oil to remove contaminants

Check mark

Flush the bearing housing with the proper lubricating oil to ensure oil quality after cleaning

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Goulds Pumps

Explore Other Assets