Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Gasboy International Consumer Electric Pump 72S
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Pump Disassembly
Preparation
Ensure appropriate container is ready to catch product when removing any cover
Remove front panel to access working parts of the pump
Pump Cover Removal
Remove pump cover screws
Remove cover plate (1) and square ring (2)
Rotor and Vanes Removal
Note orientation of parts
Remove key (3) and withdraw rotor and vanes from pump block (12)
Pump Finish Preservation
Painted Surface Maintenance
Clean all painted surfaces with high grade automobile polish
Apply a coat of paste wax to protect the finish
Avoid using abrasive cleaners or polish
Avoid using high-pressure spraying equipment
Stainless Steel Cabinet Maintenance
Wash with mild detergent or soap and water
Rinse with clean water
Avoid using abrasive cleaners
Meter-Register Disassembly
Disassembly Steps
Remove components for cleaning
Separate and clean top and bottom half of the measuring chamber
Reassembly Steps
Ensure baffle is seated in grooves in top and bottom halves and through slot in measuring disc (7)
Check if the disc rotates freely after reassembly
Torque the measuring chamber screws (4) to 20-25 ft-lbs
Replace the measuring chamber in the meter body
Use a new O-ring (3) when reassembling register to meter body
1860 3-Wheel Register Bearing and Seal Assembly Replacement
Disassembly
Remove all gears in gear train
Ensure spacer washer (43) is not lost
Disassemble items from register
Withdraw gear and shaft (27), bearing and seal assembly (36), and O-ring (35)
Bearing and Seal Assembly Replacement
Slide new O-ring (35) over bearing and seal (36)
Insert gear and shaft (27) through housing (33) and O-ring seal assembly (35 and 36)
Press seal and shaft together to seat bearing and seal into square cavity in housing
6 Monthly Pump Inspection
Visual Inspection
Check for visible signs of wear or damage
Inspect the pump for any leaks
Operational Check
Does the pump start and stop correctly?
Record the flow rate of the pump
Is the flow rate within the normal range?
Safety Check
Ensure emergency stop button is functional
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX