MaintainX Asset Hub logo
EnterprisePricing
Gasboy International

Gasboy International Consumer Electric Pump 1820RC

Need answers fast?
Explore the manual using AI.

Gasboy International Consumer Electric Pump 1820RC
Gasboy International Consumer Electric Pump 1820RC

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gasboy International Consumer Electric Pump 1820RC

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gasboy International Consumer Electric Pump 1820RC

Gasboy International Consumer Electric Pump 1820RC

Create an account to install this asset package.

Maintenance Plans for Gasboy International Consumer Electric Pump Model 1820RC

Integrate maintenance plans directly into your work orders in MaintainX.

4860 4-Wheel Register Bearing and Seal Assembly Replacement

Check mark

Preparation

Check mark

Ensure means are available to catch liquid draining from the meter housing.

Check mark

Disassembly

Check mark

Remove housing from meter body by taking out four screws.

Check mark

Remove gears and components

Check mark

Seal and Bearing Replacement

Check mark

Slide new O-ring over new bearing seal.

Check mark

Insert shaft (14) through spacer (15) and bearing (16).

Check mark

Press assembled shaft and seal through housing and seat the square of the bearing into the recess in the register housing (18).

Run this procedureArrow right

6 Monthly Pump Inspection

Check mark

Visual Inspection

Check mark

Inspect pump exterior for any visible damage or wear

Check mark

Check for any leaks around the pump

Check mark

Verify that all labels and safety warnings are legible and in place

Check mark

Operational Check

Check mark

Does the pump start and stop correctly?

Check mark

Is the pump operating without unusual noises?

Check mark

Performance Evaluation

Check mark

Record the pump's flow rate

Run this procedureArrow right

Pump Finish Preservation

Check mark

Painted Surface Maintenance

Check mark

Clean all painted surfaces with high grade automobile polish

Check mark

Apply a coat of paste wax to protect the finish

Check mark

Avoid using abrasive cleaners or polish

Check mark

Avoid using high-pressure spraying equipment

Check mark

Stainless Steel Cabinet Maintenance

Check mark

Wash with mild detergent or soap and water

Check mark

Rinse with clean water

Check mark

Avoid using abrasive cleaners

Run this procedureArrow right

1860 3-Wheel Register Bearing and Seal Assembly Replacement

Check mark

Disassembly

Check mark

Remove all gears in gear train

Check mark

Ensure spacer washer (43) is not lost

Check mark

Disassemble items from register

Check mark

Withdraw gear and shaft (27), bearing and seal assembly (36), and O-ring (35)

Check mark

Bearing and Seal Assembly Replacement

Check mark

Slide new O-ring (35) over bearing and seal (36)

Check mark

Insert gear and shaft (27) through housing (33) and O-ring seal assembly (35 and 36)

Check mark

Press seal and shaft together to seat bearing and seal into square cavity in housing

Run this procedureArrow right

Pump Disassembly

Check mark

Preparation

Check mark

Remove the front panel to access the working parts of the pump.

Check mark

Prepare an appropriate container to catch any product when removing covers.

Check mark

Pump Cover Removal

Check mark

Remove pump cover screws.

Check mark

Remove cover plate (1) and square ring (2).

Check mark

Note orientation of parts

Check mark

Remove key (3) and withdraw rotor and vanes from pump block (12).

Check mark

Ensure washer (6) and spring (7) remain on pump shaft.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gasboy International

Explore Other Assets