MaintainX Asset Hub logo
EnterprisePricing
Gasboy International

Gasboy International Consumer Electric Pump 1820

Need answers fast?
Explore the manual using AI.

Gasboy International Consumer Electric Pump 1820
Gasboy International Consumer Electric Pump 1820

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Gasboy International Consumer Electric Pump 1820

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Gasboy International Consumer Electric Pump 1820

Gasboy International Consumer Electric Pump 1820

Create an account to install this asset package.

Maintenance Plans for Gasboy International Consumer Electric Pump Model 1820

Integrate maintenance plans directly into your work orders in MaintainX.

1860 3-Wheel Register Service

Check mark

Front Panel and Dial Removal

Check mark

Remove self-tapping screws and lift off the front panel assembly.

Check mark

Remove screws with fiber washers and lift off components

Check mark

Parts Withdrawal

Check mark

Withdraw all parts (8 through 22) while observing their position and relationship.

Check mark

Totalizer Assembly Removal

Check mark

Remove screw (1) to take out the totalizer assembly (3).

Check mark

Gear Train Access

Check mark

Remove register (1 through 33) by taking out 4 screws and lifting it off the meter body.

Run this procedureArrow right

Meter-Register Disassembly

Check mark

Disassembly Steps

Check mark

Remove components for cleaning

Check mark

Cleaning and Inspection

Check mark

Separate and clean top and bottom half of the measuring chamber

Check mark

Ensure baffle is seated in grooves in top and bottom halves and through slot in measuring disc (7)

Check mark

Check if the measuring disc rotates freely

Check mark

Reassembly Steps

Check mark

Reassemble the measuring chamber without dropping or sharply striking parts

Check mark

Torque screws (4) to 20-25 ft-lbs

Run this procedureArrow right

Pump Finish Preservation

Check mark

Painted Surface Maintenance

Check mark

Clean all painted surfaces with high grade automobile polish

Check mark

Apply a coat of paste wax to all painted surfaces

Check mark

Ensure no abrasive cleaners or polish were used

Check mark

Ensure no high-pressure spraying equipment was used

Check mark

Stainless Steel Cabinet Maintenance

Check mark

Wash stainless steel cabinets with mild detergent or soap and water

Check mark

Rinse stainless steel cabinets with clean water

Check mark

Ensure no abrasive cleaners were used

Run this procedureArrow right

Meter Calibration

Check mark

Determine Meter Style

Check mark

Select the style of your meter

Check mark

Initial Setup

Check mark

Ensure the pump is adjusted for accurate measure for gasoline within + .05 gallons at the factory

Check mark

Has the device been reported to local Weights and Measures officials for inspection?

Check mark

Calibration Preparation

Check mark

Choose the flow rate for zero calibration point (e.g., middle or top notch position on nozzle)

Check mark

Use a certified five-gallon measure with sight glass and scale

Check mark

Fill and drain the test measure to wet interior surfaces completely

Run this procedureArrow right

6 Monthly Pump Inspection

Check mark

Visual Inspection

Check mark

Check for visible damage or wear on the following parts

Check mark

Inspect the pump for any leaks

Check mark

Operational Check

Check mark

Record the current meter reading

Check mark

Is the pump operating smoothly without unusual noises?

Check mark

Test the emergency shut-off functionality

Check mark

Maintenance Tasks

Check mark

Lubricate moving parts as necessary

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Gasboy International

Explore Other Assets