

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Gasboy International Consumer Electric Pump 1820
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
1860 3-Wheel Register Service
Front Panel and Dial Removal
Remove self-tapping screws and lift off the front panel assembly.
Remove screws with fiber washers and lift off components
Parts Withdrawal
Withdraw all parts (8 through 22) while observing their position and relationship.
Totalizer Assembly Removal
Remove screw (1) to take out the totalizer assembly (3).
Gear Train Access
Remove register (1 through 33) by taking out 4 screws and lifting it off the meter body.
Meter-Register Disassembly
Disassembly Steps
Remove components for cleaning
Cleaning and Inspection
Separate and clean top and bottom half of the measuring chamber
Ensure baffle is seated in grooves in top and bottom halves and through slot in measuring disc (7)
Check if the measuring disc rotates freely
Reassembly Steps
Reassemble the measuring chamber without dropping or sharply striking parts
Torque screws (4) to 20-25 ft-lbs
Pump Finish Preservation
Painted Surface Maintenance
Clean all painted surfaces with high grade automobile polish
Apply a coat of paste wax to all painted surfaces
Ensure no abrasive cleaners or polish were used
Ensure no high-pressure spraying equipment was used
Stainless Steel Cabinet Maintenance
Wash stainless steel cabinets with mild detergent or soap and water
Rinse stainless steel cabinets with clean water
Ensure no abrasive cleaners were used
Meter Calibration
Determine Meter Style
Select the style of your meter
Initial Setup
Ensure the pump is adjusted for accurate measure for gasoline within + .05 gallons at the factory
Has the device been reported to local Weights and Measures officials for inspection?
Calibration Preparation
Choose the flow rate for zero calibration point (e.g., middle or top notch position on nozzle)
Use a certified five-gallon measure with sight glass and scale
Fill and drain the test measure to wet interior surfaces completely
6 Monthly Pump Inspection
Visual Inspection
Check for visible damage or wear on the following parts
Inspect the pump for any leaks
Operational Check
Record the current meter reading
Is the pump operating smoothly without unusual noises?
Test the emergency shut-off functionality
Maintenance Tasks
Lubricate moving parts as necessary
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













