

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Frigidaire Refrigerator FRT18KR7EQ2
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
24 Hours Refrigerator Startup Check
Initial Setup
Ensure refrigerator doors are closed for at least 8 to 12 hours before loading with food
Set refrigerator and freezer controls to initial setting
Post 24 Hours Check
Have the controls been adjusted as needed?
Is the ice maker equipped?
Discard ice made during the first 24 hours due to possible discoloration or odd flavor
Fan-Cooled Condenser Coil Cleaning
Applies to fan-cooled models only
Is the refrigerator operating under dusty or greasy conditions, or is there significant pet traffic in your home?
Cleaning Procedure
Remove the toe grille
Use an extended vacuum attachment to remove dust build-up from the condenser coils
Use a condenser cleaning brush to remove dust build-up from the condenser coils
Ensure the following tools are available
Technician's Signature
6 Monthly Refrigerator Interior Cleaning
Preparation
Unplug the electrical power cord from the wall outlet
Wipe up any spills immediately
Cleaning Solution Preparation
Mix 2 tablespoons of baking soda in 1 quart of warm water
Alternatively, use soap and water
Interior Cleaning
Wring excess water out of sponge or cloth before cleaning around controls, light bulb, or any electrical part
Clean interior and door liner with prepared solution
Air-Cooled Condenser Coil Cleaning
Preparation
Ensure the refrigerator is unplugged
Verify the type of condenser
Cleaning Process
Attach the dusting tool to the vacuum cleaner
Use the vacuum to remove dust from the condenser coils
Post-Cleaning
Is the area around the condenser clean and free of dust?
Plug the refrigerator back in
Initial Ice Maker Startup Check
Initial Setup
Ensure the wire signal arm is in the correct position
Is the water supply hooked up immediately?
Post Plumbing Connection
Open the water supply valve
Place the ice container under the ice maker and push it as far back as possible
Lower the wire signal arm to its 'down' or ON position
Initial Ice Production
Are the first ice cubes discolored or have an odd flavor?
Access the parts list for your equipment in MaintainX.
Water Line Kit
5303917950
Water Line Kit
5303917950
Water Line Kit
5303917950
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













