MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Screw Chiller AWV016

Need answers fast?
Explore the manual using AI.

Daikin Screw Chiller AWV016
Daikin Screw Chiller AWV016

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Screw Chiller AWV016

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Screw Chiller AWV016

Daikin Screw Chiller AWV016

Create an account to install this asset package.

Maintenance Plans for Daikin Screw Chiller Model AWV016

Integrate maintenance plans directly into your work orders in MaintainX.

Screw Chiller Lubrication

Check mark

Warning: Handle POE oil carefully using proper protective equipment (gloves, eye protection, etc.).

Check mark

Fan motor bearings noise check

Check mark

CAUTION: Avoid prolonged exposure of refrigerant to the atmosphere to prevent moisture absorption.

Check mark

Select the type of POE oil used

Check mark

Compressor oil heater is on when the compressor is off and off when the compressor is on?

Check mark

Sign off on the screw chiller lubrication

Run this procedureArrow right

1 Weekly Screw Chiller Maintenance

Check mark

General

Check mark

Complete unit log and review. Log readings can be taken daily for a higher level of unit observation.

Check mark

Electrical ( * including the VFDs)

Check mark

Clean control box fan filter. The weekly fan filter cleaning schedule can be modified to meet job conditions. It is important that the filter allows full air flow.

Check mark

Refrigeration/Lubricant

Check mark

Check liquid line sight glasses for clear flow

Check mark

Check compressor oil sight glass for correct level (lubricant charge);

Run this procedureArrow right

Oil Filter Disassembling

Check mark

Prior to this procedure, pump out the compressor. Isolate the electrical supply to the control panels and compressor motor terminal. Filter should be changed when pressure drop delta goes above the linear line in Figure 74.

Check mark

WARNING:

Check mark

After the compressor has been pumped down and isolated, the oil contained inside the filter housing will remain hot enough to cause burns for some time afterwards. Always allow sufficient time for the oil to cool down so that it is cool enough not to be a danger when drained off (less than 35°C is recommended). Severe injury from burns can result.

Check mark

Oil filter assembly components are:

Check mark

- Oil Filter – 250mm

Check mark

- Oil Filter Housing Cover

Check mark

- O-Ring – 89.5x3

Check mark

- O-Ring – 76.1x3.4

Check mark

- (6) M8 Bolts

Run this procedureArrow right

Screw Chiller Pre-Startup Inspection

Check mark

Inspect the chiller to ensure no components became loose or damaged during shipping or installation, including leak test and wiring check.

Check mark

Discharge shutoff valve and the optional compressor suction butterfly valves are open?

Check mark

Manual liquid line shutoff valves at the outlet of the subcooler coils are open?

Check mark

Leaving chilled water temperature set point on the MicroTech® III controller

Check mark

Auxiliary equipment for the installation started by turning on the time clock, and/or remote on/off switch, and chilled water pump?

Check mark

Pumpdown switches Q1 and Q2 are in the “Pumpdown and Stop” (open) position?

Check mark

S1 switch is in the “Auto” position?

Check mark

Under the “Control Mode” menu of the keypad, is the unit in the automatic Cool Mode?

Check mark

System started by moving pumpdown switch Q1 to the “Auto” position?

Run this procedureArrow right

Oil Filter Assembling

Check mark

Prior to this procedure, pump out the compressor. Isolate the electrical supply to the control panels and compressor motor terminal. Filter should be changed when pressure drop delta goes above the linear line in Figure 74.

Check mark

WARNING:

Check mark

After the compressor has been pumped down and isolated, the oil contained inside the filter housing will remain hot enough to cause burns for some time afterwards. Always allow sufficient time for the oil to cool down so that it is cool enough not to be a danger when drained off (less than 35°C is recommended). Severe injury from burns can result.

Check mark

Oil filter assembly components are:

Check mark

- Oil Filter – 250mm

Check mark

- Oil Filter Housing Cover

Check mark

- O-Ring – 89.5x3

Check mark

- O-Ring – 76.1x3.4

Check mark

- (6) M8 Bolts

Run this procedureArrow right

Parts for Daikin Screw Chiller AWV016

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

AWG Wire Gauge

83754

AWG Wire

83804

Enviro-Coil Concentrate, Hydro-Balance Corp P.O. Box 730 Prosper, TX 75078 800-527-5166

H-EC01

Chloride Remover, Chlor*Rid Int’l, Inc. P.O. Box 908 Chandler, AZ 85244 800-422-3217

Chlor*Rid DTS

AWG Wire Gauge

83754

AWG Wire

83804

Enviro-Coil Concentrate, Hydro-Balance Corp P.O. Box 730 Prosper, TX 75078 800-527-5166

H-EC01

Chloride Remover, Chlor*Rid Int’l, Inc. P.O. Box 908 Chandler, AZ 85244 800-422-3217

Chlor*Rid DTS

AWG Wire Gauge

83754

AWG Wire

83804

Enviro-Coil Concentrate, Hydro-Balance Corp P.O. Box 730 Prosper, TX 75078 800-527-5166

H-EC01

Chloride Remover, Chlor*Rid Int’l, Inc. P.O. Box 908 Chandler, AZ 85244 800-422-3217

Chlor*Rid DTS

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets