MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Screw Chiller AWV030

Need answers fast?
Explore the manual using AI.

Daikin Screw Chiller AWV030
Daikin Screw Chiller AWV030

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Screw Chiller AWV030

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Screw Chiller AWV030

Daikin Screw Chiller AWV030

Create an account to install this asset package.

Maintenance Plans for Daikin Screw Chiller Model AWV030

Integrate maintenance plans directly into your work orders in MaintainX.

Microchannel Aluminum Coils Cleaning

Check mark

WARNING: Prior to cleaning the unit, turn off and lock out the main power switch to the unit and close all access panels.

Check mark

Did you turn off and lock out the main power switch to the unit and close all access panels?

Check mark

Surface loaded fibers or dirt should be removed prior to water rinse to prevent further restriction of airflow.

Check mark

Choose the method used to remove surface loaded fibers or dirt

Check mark

NOTE: Use of a water stream, such as a garden hose, against a surface loaded coil will drive the fibers and dirt into the coil. This will make cleaning efforts more difficult.

Check mark

Did you avoid using a water stream against a surface loaded coil?

Check mark

High velocity water from a pressure washer or compressed air should only be used at a very low pressure to prevent fin and/ or coil damages.

Check mark

Did you use high velocity water or compressed air at a very low pressure?

Check mark

No maintenance is ordinarily required except the routine removal of dirt and debris from the outside surface of the fins.

Run this procedureArrow right

Screw Chiller Lubrication

Check mark

Warning: Handle POE oil with proper protective equipment (gloves, eye protection, etc.)

Check mark

Fan motor bearings noise check

Check mark

CAUTION: Avoid prolonged exposure of refrigerant to the atmosphere

Check mark

Select the type of POE oil used

Check mark

Compressor oil heater is functioning properly?

Check mark

Sign off on the lubrication procedure

Run this procedureArrow right

3 Monthly Epoxy Coated Coils Cleaning

Check mark

Warning: This cleaning procedure requires trained personnel with PPE!

Check mark

Quarterly cleaning is essential to extend the life of an epoxy coated coil and is required to maintain warranty coverage.

Check mark

Surface debris removed from the coil?

Check mark

Coil cleaned with an approved coil cleaner?

Check mark

Select the cleaning agent used

Check mark

Soluble salts removed with CHLOR*RID DTS?

Check mark

Coil rinsed properly?

Check mark

Warning: Harsh chemicals, household bleach or acid cleaners should not be used to clean epoxy coated coils.

Check mark

Sign off on the coil cleaning

Run this procedureArrow right

1 Yearly Screw Chiller Maintenance

Check mark

Annual (or spring startup) operations include all weekly and monthly operations.

Check mark

General:

Check mark

- Inspect thermal insulation for integrity

Check mark

- Clean and paint as required

Check mark

Electrical ( * including the VFDs):

Check mark

- Sequence test controls

Check mark

- Check contactors for pitting, replace as required

Check mark

- Check terminals for tightness, tighten as necessary

Check mark

- Clean control panel interior

Run this procedureArrow right

Electrical Terminals Check

Check mark

DANGER: Electric equipment can cause electric shock which will cause severe personal injury or death. Turn off, lock out and tag all power before continuing with following service. Panels can have more than one power source.

Check mark

CAUTION: Periodically check electrical terminals for tightness and tighten as required. Always use a backup wrench when tightening electrical terminals.

Check mark

Power turned off, locked out and tagged?

Check mark

Electrical terminals checked for tightness

Check mark

Backup wrench used when tightening electrical terminals

Check mark

Sign off on the electrical terminals check

Run this procedureArrow right

Parts for Daikin Screw Chiller AWV030

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

AWG Wire Gauge

83754

AWG Wire

83804

Enviro-Coil Concentrate, Hydro-Balance Corp P.O. Box 730 Prosper, TX 75078 800-527-5166

H-EC01

Chloride Remover, Chlor*Rid Int’l, Inc. P.O. Box 908 Chandler, AZ 85244 800-422-3217

Chlor*Rid DTS

AWG Wire Gauge

83754

AWG Wire

83804

Enviro-Coil Concentrate, Hydro-Balance Corp P.O. Box 730 Prosper, TX 75078 800-527-5166

H-EC01

Chloride Remover, Chlor*Rid Int’l, Inc. P.O. Box 908 Chandler, AZ 85244 800-422-3217

Chlor*Rid DTS

AWG Wire Gauge

83754

AWG Wire

83804

Enviro-Coil Concentrate, Hydro-Balance Corp P.O. Box 730 Prosper, TX 75078 800-527-5166

H-EC01

Chloride Remover, Chlor*Rid Int’l, Inc. P.O. Box 908 Chandler, AZ 85244 800-422-3217

Chlor*Rid DTS

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets