MaintainX Asset Hub logo
EnterprisePricing
Daikin

Daikin Outdoor Unit Multi-Split Type Air Conditioner 2MXS18NMVJU

Need answers fast?
Explore the manual using AI.

Daikin Outdoor Unit Multi-Split Type Air Conditioner 2MXS18NMVJU
Daikin Outdoor Unit Multi-Split Type Air Conditioner 2MXS18NMVJU

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Daikin Outdoor Unit Multi-Split Type Air Conditioner 2MXS18NMVJU

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Outdoor Unit Multi-Split Type Air Conditioner 2MXS18NMVJU

Daikin Outdoor Unit Multi-Split Type Air Conditioner 2MXS18NMVJU

Create an account to install this asset package.

Maintenance Plans for Daikin Outdoor Unit Multi-Split Type Air Conditioner Model 2MXS18NMVJU

Integrate maintenance plans directly into your work orders in MaintainX.

Capacitor Voltage Check

Check mark

Warning: This procedure requires trained personnel with PPE!

Check mark

Main circuit checked for short circuit?

Check mark

Warning: Never touch any live parts during the procedure.

Check mark

Voltage between FU2 and DC–

Check mark

Is the voltage 50 V or less?

Check mark

Ensure firm contact between the multimeter probes and the test points.

Check mark

Sign off on the capacitor voltage check

Run this procedureArrow right

Rotation Pulse Check

Check mark

Outdoor fan motor

Check mark

Voltage between the pins 4 - 7

Check mark

Control voltage between the pins 4 - 3

Check mark

Rotation command voltage between the pins 4 - 2

Check mark

Pulses at the pins 4 - 1 when the outdoor fan motor is rotated 1 turn by hand

Check mark

Fuse melted?

Check mark

If NG in step 2

Check mark

If NG in step 4

Check mark

If OK in both steps 2 and 4

Run this procedureArrow right

Power Module Check

Check mark

Warning: Ensure the voltage between (+) and (-) of the power module is about 0 V before proceeding

Check mark

Enter the voltage between (+) and (-) of the power module

Check mark

Disconnect the compressor harness connector from the outdoor unit PCB. To disengage the connector, press the protrusion on the connector.

Check mark

Was the compressor harness connector successfully disconnected?

Check mark

Measure resistance between the (+) or (-) terminal of the power module and the U, V or W terminal of the compressor with a multimeter.

Check mark

Enter the resistance measurement

Check mark

Evaluate the measurement results

Check mark

Sign off on the power module check

Run this procedureArrow right

Power Supply Waveform Check

Check mark

Warning: This check requires trained personnel with PPE!

Check mark

Measure the power supply waveform between No. 1 and No. 2 on the terminal board

Check mark

Upload a photo of the measured waveform

Check mark

Is the power supply waveform a sine wave?

Check mark

Is there waveform disturbance near the zero-cross?

Check mark

Sign off on the power supply waveform check

Run this procedureArrow right

Electronic Expansion Valve Check

Check mark

Conduct the following to check the electronic expansion valve (EV).

Check mark

1. Check if the EV connector is correctly inserted in the PCB. Match the EV unit number and the connector number.

Check mark

2. Turn the power off and on again, and check if all the EVs generate a latching sound.

Check mark

3. If any of the EVs does not generate a latching sound in the above step 2, disconnect that connector and check the continuity using a multimeter.

Check mark

Check the continuity between the pins 5 - 1, 5 - 2, 5 - 3, 5 - 4. If there is no continuity between the pins, the EV coil is faulty.

Check mark

4. If no EV generates a latching sound in the above step 2, the outdoor unit PCB is faulty.

Check mark

5. If the continuity is confirmed in the above step 3, mount a good coil (which generated a latching sound) in the EV unit that did not generate a latching sound, and check if that EV generates a latching sound.

Check mark

∗If a latching sound is generated, the outdoor unit PCB is faulty.

Check mark

∗If a latching sound is not generated, the EV unit is faulty.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin

Explore Other Assets