MaintainX Logo
EnterprisePricing
Daikin

Daikin Outdoor Unit For Split System RXJ20M2V1B

Need answers fast?
Explore the manual using AI.

Daikin Outdoor Unit For Split System RXJ20M2V1B
Daikin Outdoor Unit For Split System RXJ20M2V1B

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Daikin Outdoor Unit For Split System RXJ20M2V1B

Daikin Outdoor Unit For Split System RXJ20M2V1B

Create an account to install this asset package.

Maintenance Plans for Daikin Outdoor Unit For Split System Model RXJ20M2V1B

Integrate maintenance plans directly into your work orders in MaintainX.

Gas Leakage Check

Check mark

WARNING: Do not mix any substance other than the specified refrigerant (R32) into the refrigeration cycle.

Check mark

When refrigerant gas leaks occur, ventilate the room as soon and as much as possible.

Check mark

R32, as well as other refrigerants, should always be recovered and never be released directly into the environment.

Check mark

Use a vacuum pump for R32 or R410A exclusively. Using the same vacuum pump for different refrigerants may damage the vacuum pump or the unit.

Check mark

Use tools for R32 or R410A (such as the gauge manifold, charging hose, or vacuum pump adapter).

Check mark

When piping work is completed, it is necessary to evacuate the air and check for gas leakage.

Check mark

If using additional refrigerant, perform air evacuating from the refrigerant pipes and indoor unit using a vacuum pump, then charge additional refrigerant.

Check mark

Use a hexagonal wrench (4mm) to operate the stop valve rod.

Check mark

All refrigerant pipe joints should be tightened with a torque wrench at the specified tightening torque.

Run this procedureArrow right

Pump Down Maintenance

Check mark

Warning: This procedure is to be performed when relocating or disposing of the unit to protect the environment.

Check mark

Valve cap removed from liquid stop valve and gas stop valve?

Check mark

Forced Cooling Operation

Check mark

Forced cooling operation carried out?

Check mark

Wait for 5 to 10 minutes

Check mark

Liquid stop valve closed with a hexagonal wrench after waiting?

Check mark

Wait for 2 to 3 minutes

Check mark

Gas stop valve closed and forced cooling operation stopped after waiting?

Check mark

Forced Cooling Operation using the indoor unit ON/OFF switch

Run this procedureArrow right

Outdoor Unit For Split System Test

Check mark

Measure the supply voltage

Check mark

Supply voltage falls in the specified range

Check mark

Select operation mode

Check mark

In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable temperature.

Check mark

Trial operation may be disabled in either mode depending on the room temperature.

Check mark

After trial operation is complete, set the temperature to a normal level (26°C to 28°C in cooling mode, 20°C to 24°C in heating mode).

Check mark

For protection, the system disables restart operation for 3 minutes after it is turned off.

Check mark

All functions and parts, such as louver movement, are working properly

Check mark

The air conditioner requires a small amount of power in its standby mode. If the system is not to be used for some time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

Run this procedureArrow right

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Daikin