Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Daikin Indoor Unit Cooling Only Air Conditioner FTNE60MV1
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Vertical Blade ASSY Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
1. For auto-swing (right and left) models
Some models have fan guards. Remove the fan guards beforehand.
The unit has 3 sets of vertical blade ASSYs linked to one another with interlock rods.
1) Release the right and left shafts.
2) Unfasten the 3 hooks for each set of vertical blade ASSY (9 hooks).
3) Pull the vertical blade ASSYs to the right and remove them.
2. For models without autoswing (right and left)
Each vertical blade ASSY has 5 or 6 fins which can not be replaced individually.
Air Filter Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Open the front panel.
Release each air filter from the 2 hooks of the front panel.
Remove the air filter by pulling out downward.
The air filter is not marked for difference between the right and left sides. Insert the air filter with the “FRONT” mark faced up.
When reassembling, insert the air filter along the guides.
Be sure to fasten the hooks when installing the air filter.
Remove the Titanium apatite photocatalytic air-purifying filter, if available, from the 5 hooks.
The right and left filters are interchangeable. Some models have no Titanium apatite photocatalytic air-purifying filter.
PCB Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove the screw on the electrical box.
Unfasten the hook and remove the shield plate.
The shield plate also has 2 hooks on the upper side (at the back).
Unfasten the 2 hooks on the top and remove the signal receiver unit.
Cut the clamp.
Unfasten the 8 hooks and remove each PCB.
Disconnect every connector from each PCB.
Some models do not have INTELLIGENT EYE sensor PCB.
Fan Motor / Fan Rotor Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
Remove the 2 screws.
Lift and remove the right side plate.
Remove the screw, and then the fan motor fixing plate.
When reassembling the fan motor and the fan rotor, provide as much as 5 mm (0.2 inch) of play between the side face of the rotor and the bottom frame.
Insert the fan motor allowing for approx. 5 mm (0.2 inch) of play.
Tighten the fan rotor screw until it stops. Then give the screw one more turn.
If the fan rotor rotates appropriately, tighten the screw completely.
If not, repeat the procedure from (1).
Indoor Heat Exchanger Removal
Warning: Be sure to wait for 10 minutes or more after turning off all power supplies before disassembling work.
In pump-down work, be sure to stop the compressor before disconnecting the refrigerant pipe. If the refrigerant pipe is disconnected with the compressor operating and the stop valve open, air may be sucked in and may generate an over-pressure in refrigeration cycle, thus resulting in pipe rupture or accidental injury.
When removing or reinstalling the indoor heat exchanger, be sure to wear gloves or wrap the indoor heat exchanger with cloths. (You may be injured by the fins.)
Caution: Be sure to conduct pump down operation before disassembling the refrigerant pipe.
If the refrigerant leaks, repair the spot of leaking, then collect all refrigerant from the unit. After conducting vacuum drying, recharge proper amount of refrigerant.
From the viewpoint of global environmental protection, make sure to use a vacuum pump for air purging.
Unscrew the flare nut for gas piping and liquid piping and disconnect both pipes.
Hold the indoor unit up with a piece of wood.
Place a plastic sheet around the drain pan to prevent wetting the floor with remaining drain.
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













