

Turn manuals into instant answers
with your AI-powered assistantTurn manuals into instant answers
with your AI-powered assistant
Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.
Find all the essential guides in one place.
Tensioning Guide
Belt-diagram
C-120 pulleys
+ 13 more
Pre-built workflows to keep your asset running smoothly.
Daily Electrical System Inspection
Replace Roller and Pulley
Install Engine B-120
+ 29 more
Integrate maintenance plans directly into your work orders.
Motion Industries
Applied Industrial Technologies
Electrical Brothers
+ 5 more
Access the parts list for your equipment in MaintainX.
Drive Motor
B2 Rollers
Tensioning System
+ 40 more

Cornelius Ice Cooled Dispenser CB2323 100 lbs
Create an account to install this asset package.
Integrate maintenance plans directly into your work orders in MaintainX.
Carbonator Installation
Clean around Carbonator tank opening removing all silicone, and make sure cavity is clean and dry
Place new Carbonator in place of the old one
Reconnect probe wire harness to pump and motor
Seal top of Carbonator with silicone
Connect the CO2 line from the barbed fitting Carbonator and tighten to 80+/- 10 in pounds (Note: replace white gasket)
Reconnect the Carbonator lines to the Carbonator
Reinstall valve body, back cover and front cover of the valve No. 8 to unit
Turn on the CO2 supply that is connected to the Carbonator
Turn on the water supply that is connected to the pump and motor
Dispenser Inspection
Upon delivery inspect the unit for damage or irregularities and immediately report problems to the delivering carrier and file a claim with that carrier.
Unit inspected for damage or irregularities
Report any problems found
Open loose parts packages and inspect parts.
Parts inspected
Report any problems found with parts
Make sure all items are present.
All items present
Report any missing items
Carbonator Removal
Ice removed from bin
Power disconnected from the unit and pump and motor
CO2 supply shut off
Water supply shut off
Cup Rest, Splash Panel, Drip Tray, Sliding Lid and Sanitary Plate removed
Pressure relieved in the system
Front cover, back cover and valve body of No. 8 removed
Plug button removed and hole covered with tape
Barb fitting for the CO2 line disconnected
Ice Bin Cleaning
CLEANING THE ICE BIN
Prepare a mild detergent soap solution in 100°F potable water
Using a nylon (not wire) bristle brush, clean the cold plate and the interior of the ice bin with the soap solution
Rinse the cold plate and interior bin surfaces with clean potable water
Using a mechanical spray bottle, prepare a sanitizing solution according to the manufacture’s directions and spray the entire interior bin surfaces. Allow to air dry
Sign off on the ice bin cleaning
Access the parts list for your equipment in MaintainX.
Pump & Motor Assy.
629087457
Clamps
Oetiker
Drain Pan Drain Line
167090002
Cold Plate Drain Line
167467072
Merchandiser Assy.
166167010
Pump & Motor Assy.
629087457
Clamps
Oetiker
Drain Pan Drain Line
167090002
Cold Plate Drain Line
167467072
Merchandiser Assy.
166167010
Pump & Motor Assy.
629087457
Clamps
Oetiker
Drain Pan Drain Line
167090002
Cold Plate Drain Line
167467072
Merchandiser Assy.
166167010
MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.
Reduce Unplanned Downtime
Ensure your team follows consistent procedures to minimize equipment failures and costly delays.
Maximize Asset Availability
Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.
Lower Maintenance Costs
Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.
Thousands of companies manage their assets with MaintainX













