MaintainX Asset Hub logo
EnterprisePricing
Cleveland

Cleveland Tablet Counter CT-1000

Need answers fast?
Explore the manual using AI.

Cleveland Tablet Counter CT-1000
Cleveland Tablet Counter CT-1000

Turn manuals into instant answers
with your AI-powered assistant
Turn manuals into instant answers
with your AI-powered assistant

PDF MANUAL

Manual for Cleveland Tablet Counter CT-1000

MAINTENANCE RESOURCES

Complete asset maintenance, one click away

Get instant access to all the maintenance information you need. Empower technicians to perform preventive maintenance with asset packages, ready to use right out of the box.

Documents

Documents & Manuals

Find all the essential guides in one place.

  • CheckTensioning Guide

  • CheckBelt-diagram

  • CheckC-120 pulleys

  • + 13 more

Work Orders

Work Order Templates

Pre-built workflows to keep your asset running smoothly.

  • CheckDaily Electrical System Inspection

  • CheckReplace Roller and Pulley

  • CheckInstall Engine B-120

  • + 29 more

Procedures

Procedures

Integrate maintenance plans directly into your work orders.

  • CheckMotion Industries

  • CheckApplied Industrial Technologies

  • CheckElectrical Brothers

  • + 5 more

Parts

Parts

Access the parts list for your equipment in MaintainX.

  • CheckDrive Motor

  • CheckB2 Rollers

  • CheckTensioning System

  • + 40 more

Cleveland Tablet Counter CT-1000

Cleveland Tablet Counter CT-1000

Create an account to install this asset package.

Maintenance Plans for Cleveland Tablet Counter Model CT-1000

Integrate maintenance plans directly into your work orders in MaintainX.

Chart Recorder Maintenance

Check mark

Warning: This unit is a precision instrument and can be damaged by rough or careless handling.

Check mark

Daily cleaning performed

Check mark

Is the unit handled with care?

Check mark

If the unit is not handled with care, report the issues to the maintenance team and stop the procedure

Check mark

Enter the current calibration reading

Check mark

Enter the next recalibration date

Check mark

Sign off on the chart recorder maintenance

Run this procedureArrow right

Cook Tank Cleaning

Check mark

WARNING: Do not use chloride based cleaners or steel wool for cleaning the cook tank.

Check mark

Prepare a warm solution of water and mild detergent

Check mark

Clean the inside and outside of the tank using a nylon brush

Check mark

Remove any grease or dirt build-up from the two probes inside the tank

Check mark

Clean the baskets and dividers using the same mild detergent

Check mark

For more difficult cleaning applications, select one of the following

Check mark

Sign off on the cook tank cleaning

Run this procedureArrow right

Hinge Adjustment

Check mark

Hinge Adjustment Instructions

Check mark

Insert 3/8\ Allen wrench"

Check mark

Turn clockwise to relieve tension on spring

Check mark

While tension is released remove one of the two slotted screws

Check mark

Insert a pin (approximately 1/8\) in the hole where the first slotted screw was removed from"

Check mark

Remove second slotted screw

Check mark

While holding Allen wrench remove pin

Check mark

Turn Allen wrench clockwise to tighten or counter-clockwise to loosen tension to produce desired effect

Check mark

Re-insert pin in one of the two holes

Run this procedureArrow right

Motor Replacement

Check mark

CAUTION: Do not scratch. Extremely delicate surface.

Check mark

Swing screen to access impeller assembly.

Check mark

Dissassemble impeller assembly by removing bolt and set screw.

Check mark

Remove motor by unscrewing four bolts from motor/fan housing.

Check mark

Punch out taper pin and remove shaft extension from old motor.

Check mark

Push shaft extension firmly onto new motor shaft.

Check mark

NOTE: Secure end of shaft with vice grips to prevent left or right rotation.

Check mark

Drill completely through shaft extension and new motor shaft using a 11/64\ bit."

Check mark

Ream to a depth of 1\ through shaft extension and new motor shaft using a #1 reamer."

Run this procedureArrow right

Solenoid Valve Maintenance

Check mark

NOTE: It is not necessary to remove the valve from the pipeline for repairs.

Check mark

WARNING: Turn off electrical power supply and depressurize valve before making repairs.

Check mark

Cleaning:

Check mark

All solenoid valves should be cleaned periodically.

Check mark

The time between cleanings will vary depending on the medium and service conditions. In general, if the voltage to the coil is correct, sluggish valve operation, excessive noise or leakage will indicate that cleaning is required. Clean valve strainer or filter when cleaning the valve.

Check mark

Preventive Maintenance:

Check mark

1. Keep the medium flowing through the valve as free from dirt and foreign material as possible.

Check mark

2. While in service, the valve should be operated at least once a month to insure proper opening and closing.

Check mark

3. Depending on the medium and service conditions, periodic inspection of internal valve parts for damage or excessive wear is recommended. Thoroughly clean all parts.

Run this procedureArrow right

Parts for Cleveland Tablet Counter CT-1000

Access the parts list for your equipment in MaintainX.

Part Name
Part Number

Ambient Heater Assembly

KE52709

Basket

CT00011

Basket Carrier C/W Lifting Bar Assembly (Includes Items 6, 7, 8 & 9)

CT000151

Basket Divider

CT00211

Binding Heat Screw, #8-32 x 3/8" Lg.

FA11091

Ambient Heater Assembly

KE52709

Basket

CT00011

Basket Carrier C/W Lifting Bar Assembly (Includes Items 6, 7, 8 & 9)

CT000151

Basket Divider

CT00211

Binding Heat Screw, #8-32 x 3/8" Lg.

FA11091

Ambient Heater Assembly

KE52709

Basket

CT00011

Basket Carrier C/W Lifting Bar Assembly (Includes Items 6, 7, 8 & 9)

CT000151

Basket Divider

CT00211

Binding Heat Screw, #8-32 x 3/8" Lg.

FA11091

Unlock efficiency
with MaintainX CoPilot

MaintainX CoPilot is your expert colleague, on call 24/7, helping your team find the answers they need to keep equipment running.

Time Lapse Icon

Reduce Unplanned Downtime

Ensure your team follows consistent procedures to minimize equipment failures and costly delays.

Wrench Clock Icon

Maximize Asset Availability

Keep your assets running longer and more reliably, with standardized maintenance workflows from OEM manuals.

Dollar Coin Icon

Lower Maintenance Costs

Turn any technician into an expert to streamline operations, maintain more assets, and reduce overall costs.

Thousands of companies manage their assets with MaintainX

DuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterrollDuracellAB InBevErgonTitan AmericaMeritUnivar SolutionsRivianCadrexMagnaMaasPresriteSoutheast PowerInterroll

More from Cleveland

Explore Other Assets